Laserfiche WebLink
TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 25 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 16, 2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> I rt w�h%%c Clear, It. breeze (NW), high 50's to low 90's Mike Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor,water truck, excavator,rock truck, loader,backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. No activity in the south area of FU-06. <br /> 2. The D6 reshapes the existing mid-slope perimeter ditch at the north end of FU-06 <br /> II. Testing <br /> 1. None. <br /> III. Conversations <br /> • None listed. <br /> Prepared Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />