17E TOR <br /> ENGINEENING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. ReportSequence <br /> Forward WMU FU-06 02.1605.07 24 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 15, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> I /MA1wc I Clear, breezy (NW), high 50's to high 80's Mike Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor,water truck, excavator, rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued placement of excess Subgrade soils outside the side project area on the east side of FU-06. <br /> 2. Continued grading Subgrade in the central and west floor areas. <br /> 3. Continued the cut at the south end of FU-06; material taken to east floor areas. <br /> ®II. Testing <br /> 1. Performed 3 FDT's in compacted Subgrade; tests SG-74 through SG-76. All tests passed. <br /> III. Conversations <br /> • With Larry Simms, Gwinn Construction, re: Has Vector Engineering, Inc. received the survey <br /> taken on the upper area of FU-06? Larry wants to start installing the LCRS system. Brian said he <br /> had not seen the survey. Brian and Larry were to discuss the matter. <br /> Prepared y: Reviewed By: Al <br /> 1 of 1 4/23/03,Rev.0 <br />