My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
613
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Rinse the turbidity probe with deionized water then place in the standard solution. <br /> 3. Adjust the meter for appropriate turbidity,scalc then read the turbidity. <br /> 4. If required use the "calibrate" adjustment on the meter to correct the instrument to read <br /> the correct turbidity. - <br /> The calibration .process will be'recorded on a turbidity calibration log. A Sample Calibration <br /> Log is located in Appendix C. Copies of calibration logs for each individual instrument are kept <br /> in a binder at the office. The logs are reviewed periodically top assess whether the instrument is <br /> becoming more difficult to c lalibraxe and therefore needs adjustment by the <br /> manufacturer, ®r if <br /> new probes are required. <br /> Equipment Decontamination <br /> To reduce the potential for introducing contaminants or cross-contaminating samples, sampling <br /> equipment that is used repeatedly, at different wells (m-line filter, meters) wip be washed in a <br /> trisodium.phosphate solution and triple rinsed with deioni=d water prior to-use.in each-welL-. <br /> The monitoring wells arc equipped with dedicated-sampling-systems which.:-will not- <br /> require <br /> decontamination. Sterile factory sealed disposable bailers are used to collect the samples_ Bailer <br /> cord is replaced between each well. <br /> Monitoring Order <br /> Groundwater monitoring will be conducted such that depth to water measurements and sampling <br /> is performed in the least contaminated wells first(based on historical results). Measurement and <br /> sampling order will then move from lessor '- *wells to the most impacted wells., This is <br /> done to reduce the potential that wells and samples can be cross contaminated. Groundwater <br /> monitoring order begins at MW 20 and then MW 12 which are the background wells. The next <br /> wells,'listed in order, to be sampled arc MW-15, -10, -1 and -3.. These wells rarely contain <br /> evidence of chemical impacts. The last wells to be-sampled, listed in order, include -14,.-13 <br /> and -2. - Proposed well 16 will be sainpled in an appropriate order depending on what <br /> constituents are detected (if any) in tfie well upon the first sampling. Initially, MW-16 will-be <br /> the last,well sampled. <br /> s <br /> Z493949401\2310323A duly 14,2404 <br /> 2W KkWC1&r'1W_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.