My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASE AND SLOPE LEACHATE COLLECTION AND REMOVAL SYSTEM DESIGN <br />WMU FU -06 SOUTHERN PORTION <br />FORWARD LANDFILL <br />PROBLEM: <br />Size the leachate collection and removal system components for the base and slope in the southern portion <br />of WMU FU -06. <br />GIVEN: <br />These calculations were previously performed for the V;Ws D-95, D-97, D-98, D-99, D-00, D-0 1, D-02, <br />FU -03, FU -04, and FU -05 design. The same methodology for performing the previous calculations was <br />used for the WMU FU -06 calculations. Previous calculations are referenced and attached, where <br />applicable. <br />SUMMARY: <br />1. Required permeability of granular drainage material is 0.1 cm/sec. <br />2. Required permeability of coarse gravel is 1 cm/sec. <br />3. Specify 6 -inch diameter, SDR 11 HDPE pipe. <br />4. Specify perforation pattern for pipes of 1/2 -inch diameter holes drilled at third points every 6 -inches <br />along pipe length. <br />5. The permanent sumps are sized assuming 10 -ft of refuse in WMU FU -06. <br />6. Site personnel will select the pump size. <br />7. A 200 -mil GDN with a hydraulic transmissivity of 1 x 10"5 M2 /sec measured using water at 68°F f3°F <br />(20°C t1.5°C) with a hydraulic gradient of 0.5 under a compressive stress of 10,000 psf. The <br />geocomposite shall be tested with onsite soil above the Geocomposite and Geomembrane below the <br />Geocomposite. The minimum test duration shall be 100 hours and the report for the test results shall <br />include measurements at intervals over the entire test duration. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.