My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sieve Size Percent Passing by Weight <br />i" 100 <br />1/211 0-20 <br />No. 4 0-5 <br />No. 200 0-2 <br />B. The minimum hydraulic conductivity to water shall be 1.0 cm/sec. <br />C. Coarse Gravel Material placed directly on geotextile and around HDPE pipe shall <br />contain no angular particles. <br />D. Coarse Gravel Material shall contain no limestone or other material that will <br />adversely react with leachate. <br />E. The Coarse Gravel shall be provided by the EARTHWORK CONTRACTOR <br />2.8 PROTECTIVE OPERATIONS LAYER <br />A. The material shall consist of generally sandy material excavated onsite. The <br />material shall be obtained from the onsite borrow area. Protective operations <br />layer placed directly above geosynthetics shall have no angular particles greater <br />than 1 inch. <br />2.9 PLYWOOD SHEETING <br />A. Plywood sheeting shall be exterior grade and provided at the dimensions shown <br />on the Construction Drawings. <br />2.10 EQUIPMENT <br />A. General: <br />1. Equipment used in constructing the Work shall be in good working order and <br />shall be operated in strict accordance with manufacturer's instructions and <br />recommendations. <br />2. Any soils contaminated by discharge of fluids from leaky or faulty equipment <br />shall be removed and properly disposed and the contaminated area backfilled <br />with clean soil, at no cost to the OWNER. <br />B. Clay Processing Equipment <br />1. Use clay processing equipment meeting the following requirements: <br />a. Of a type and of sufficient size to process the onsite clay material to <br />meet requirements for maximum clod size and to provide a <br />homogeneously moisture conditioned material. <br />b. Consisting of rotovator, discs, tilling, or other methods as necessary and <br />Forward Landfill WMU FU -06 <br />02300 7 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.