3.4 EXCAVATION <br />A. Perform all excavation of every description, regardless of the type, nature, or <br />condition of material encountered, as specified, shown, or required to accomplish <br />the construction. Transport excavated material to where it will be placed or to the <br />designated stockpile area. Any refuse excavated shall be placed in active landfill <br />areas, as directed by the OWNER. <br />B. The EARTHWORK CONTRACTOR shall selectively stockpile the onsite fine- <br />grained material to use as Clay Liner Material, Clay Plug, or Clay Earthfill. The <br />EARTHWORK CONTRACTOR shall also selectively stockpile material <br />appropriate for use as protective operations layer. <br />C. Soils to be excavated are variable. Fine-grained material suitable for use as the <br />Clay Liner material, Clay Plug, or Clay Earthfill may only be encountered in thin <br />intermittent seams. <br />D. The EARTHWORK CONTRACTOR shall make all reasonable efforts to <br />determine the type of soil being excavated at all times. Equipment operators or <br />the EARTHWORK CONTRACTOR's representative directing excavation shall <br />have sufficient knowledge and, understanding of soil classifications to determine <br />general soil type. <br />E. The EARTHWORK CONTRACTOR shall stockpile excavated material in <br />accordance with Section 3.6 of this Specification and shall direct equipment <br />operators to the appropriate stockpile area depending on the soil classification of <br />the majority of material that makes up the excavation equipment's payload. <br />F. Refuse may be encountered in some excavation areas within WMU FU -06. The <br />EARTHWORK CONTRACTOR shall notify the DESIGN ENGINEER and <br />QA/QC CONSULTANT if refuse is encountered in areas other than at tie- <br />ins/connections to existing WMUs at the site. The DESIGN ENGINEER will <br />provide guidance on the depth the refuse shall be excavated and the appropriate <br />backfill procedures. The EARTHWORK CONTRACTOR shall dispose of the <br />excavated refuse in the active portion of the landfill or as directed by the <br />OWNER. <br />G. Excavation to be carried out for the convenience of the EARTHWORK <br />CONTRACTOR shall conform to the limits approved by the DESIGN <br />ENGINEER, QA/QC CONSULTANT, and OWNER and shall be at no additional <br />expense to the OWNER. <br />H. Excavated material shall be placed a sufficient distance from the edge of <br />excavations to prevent cave-ins or bank slides. <br />I. The CONTRACTOR shall excavate to sufficient lines and grades to construct the <br />compacted clay liner and sumps as shown on the Construction Drawings and <br />described in these Specifications. <br />Forward Landfill WMU FU -06 <br />02300 11 EARTHWORK <br />