My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br />working days in advance of when the subgrade is completed and ready for as - <br />built surveys. The OWNER will survey the top of the base and slope subgrade <br />in accordance with Section 01410, SURVEYS. The survey shall provide <br />coordinates and elevations of the subgrade surface at a minimum of 75 -foot <br />centers and delineating prominent features. The results of the survey will be <br />provided to the QA/QC CONSULTANT within 2 days of the survey for <br />approval prior to placing overlying materials. The QA/QC CONSULTANT <br />shall have 2 working days to review survey results and may independently <br />verify survey results. The time taken by the QA/QC CONSULTANT in <br />checking and verifying the survey results will be considered included in the <br />total calendar days allotted the EARTHWORK CONTRACTOR before <br />liquidated damages are assessed. <br />B. After completion of clay liner and subgrade fill, proof -roll the surface of the entire <br />lined area with a loaded dump truck or similar heavy -wheeled equipment to detect <br />soft or loose zones. Notify the QA/QC CONSULTANT prior to commencement <br />of proof -rolling. If soft or loose zones are found, excavate the soft or loose <br />material to a depth accepted by the QA/QC CONSULTANT, then fill with Clay <br />Liner or General Earthfill, as appropriate. The Clay Liner or General Earthfill <br />shall be compacted as specified for such fill. <br />3.9 CONSTRUCTION OF CLAY LINER <br />A. General: <br />1. Clay Liner Material shall be processed to meet the requirements of Article <br />2.4 of this Specification. The EARTHWORK CONTRACTOR may request <br />information from the OWNER on successful processing and placement <br />procedures used for the construction of previous WMUs at the Forward <br />Landfill. The EARTHWORK CONTRACTOR shall have the option to <br />determine construction procedures to be used, subject to the approval and <br />acceptance testing by the QA/QC CONSULTANT. <br />2. The EARTHWORK CONTRACTOR shall process the Clay Liner Material <br />suitable for the purpose intended. After processing, the Clay Liner Material <br />shall be free from dry clods, roots, organic matter, frozen material, debris, <br />rocks or stones larger than 1 inch, and other deleterious material. Clay <br />Liner Material shall be thoroughly blended and compacted to provide a <br />homogeneous material relatively uniform in gradation and moisture content. <br />3. The Clay Liner Material shall be as uniform as possible, free of penetrating <br />cracks, and having interlift boundaries completely blended. The soil shall <br />be kneaded by multiple passes with a heavy -weight footed compactor in <br />order to produce a soil structure having low hydraulic conductivity, and not <br />simply achieving a relative compaction goal. The top surface shall be <br />smooth, graded to the grades shown on the Construction Drawings, and <br />ready to receive overlying components of the lining system. The prepared <br />surface shall be free of major irregularities, which in the opinion of the <br />QA/QC CONSULTANT, may damage the overlying geomembrane. <br />Forward Landfill WMU FU -06 <br />02300 14 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.