n <br />3. If the clay liner becomes softened due to moisture changes, scarify and mix <br />full depth of damage, adjust water content to specified value, and recompact <br />as previously specified, at the EARTHWORK CONTRACTOR's sole <br />expense. <br />F. Field Quality Control <br />1. As the clay liner is being placed and compacted, the QA/QC <br />CONSULTANT will be monitoring the construction activities and soil <br />properties as described in the CQA Manual. Acceptance testing frequencies <br />are defined in the CQA Manual. The EARTHWORK CONTRACTOR <br />shall cooperate with the QA/QC CONSULTANT in obtaining samples for <br />the CQA acceptance testing, and in leveling and backfilling areas designated <br />by the QA/QC CONSULTANT. <br />2. The location of acceptance testing shall be determined solely by the QA/QC <br />CONSULTANT. The QA/QC CONSULTANT may test any lift of the clay <br />liner at any time, location, or elevation. <br />3. Holes left by sampling and testing shall be backfilled by the EARTHWORK <br />CONTRACTOR using the Clay Liner Material. <br />4. If acceptance testing by the QA/QC CONSULTANT indicates that the Clay <br />Liner Material does not meet specified requirements for density, water <br />content, or lift thickness, the EARTHWORK CONTRACTOR shall <br />terminate material placement until corrective measures are taken at the <br />EARTHWORK CONTRACTOR's sole expense. Corrective measures <br />could include, but are not limited to, scarifying and recompacting of <br />material or removal of material that does not meet the requirements of these <br />Specifications. <br />5. If acceptance testing by the QA/QC CONSULTANT indicates that the Clay <br />Liner Material does not meet specified requirements for particle size, <br />classifications, plasticity, or hydraulic conductivity, then the Clay Liner <br />Material which failed will be retested. If the second test results indicate <br />failure to meet the specified requirements, the QA/QC CONSULTANT may <br />order a design modification or the removal, disposal, and replacement of the <br />unsuitable Clay Liner Material. <br />6. Clay Liner Acceptance: Final acceptance of the clay liner will be based on <br />acceptance and control tests made on completed Work, on material samples <br />taken from the completed layer, and the thickness as calculated from the top <br />of subgrade and top of clay liner surveys. Acceptance testing for final <br />acceptance shall be performed by the soil testing laboratory in accordance <br />with these Specifications and the CQA Manual. <br />G. Protection: <br />1. Do not route or allow construction traffic, except as necessary, on top of <br />clay liner once material has been placed and compacted. <br />2. Constructed clay liner shall be maintained to meet the requirements of this <br />Specification until final completion and acceptance of the Work. This shall <br />include all measures to prevent erosion. During seasonal or other extended <br />shutdowns, all exposed surfaces shall be protected as detailed in Article 3. 1, <br />Forward Landfill WMU FU -06 <br />02300 <br />17 <br />EARTHWORK <br />