My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROTECTION OF EXPOSED SURFACES, of this Section. In addition, <br />the clay liner shall be protected from any contamination that increases the <br />hydraulic conductivity. Any contaminated material shall be removed and <br />replaced at no cost to the OWNER. <br />3.10 CONSTRUCTION OF CLAY PLUG AND CLAY EARTHFILL <br />A. General: <br />3. Clay Plug Material shall be processed to meet the requirements of Article <br />2.5 of this Specification. The EARTHWORK CONTRACTOR shall have <br />the option to determine construction procedures to be used, subject to the <br />approval and acceptance testing by the QA/QC CONSULTANT. <br />4. The EARTHWORK CONTRACTOR shall process the Clay Plug and Clay <br />Earthfill Material suitable for the purpose intended. After processing, the <br />Clay Plug and Clay Earthfill Material shall be free from dry clods, roots, <br />organic matter, frozen material, debris, rocks or stones larger than 1 inch, <br />and other deleterious material. Clay Plug and Clay Earthfill Material shall <br />be thoroughly blended and compacted to provide a homogeneous material <br />relatively uniform in gradation and moisture content. <br />5. The Clay Plug and Clay Earthfill Material shall be as uniform as possible, <br />free of penetrating cracks, and having interlift boundaries completely <br />blended. The soil shall be compacted to produce a soil structure having low <br />hydraulic conductivity. <br />B. Compaction: <br />1. Soil shall be spread evenly over the prepared subgrade with a thickness as <br />required to achieve a 6 -inch compacted lift, with a maximum 8 -inch loose <br />lift. <br />2. The minimum final thickness and extent of the clay plug and clay earthfill <br />shall be as shown on the Construction Drawings. <br />3. Moisture conditioning shall be uniform throughout each lift <br />4. The clay plug and clay earthfill material shall be compacted in-place to a <br />minimum dry density of 90 percent relative compaction at a water content <br />of 3 to 6 percent greater than the optimum water content as measured by <br />ASTM D1557. <br />5. Scarify surface of each lift to a depth of 2 inches prior to placing the <br />subsequent lift of Clay Plug and Clay Earthfill Material. <br />6. Clay Plug and Clay Earthfill Material shall not be placed at a high water <br />content so that excessive cracking occurs when the material dries out. <br />C. Moisture Control <br />1. During compacting operations, maintain water content in each lift within the <br />range of 3 to 6 percent greater than the optimum water content. <br />Forward Landfill WMU FU -06 <br />02300 18 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.