My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Equipment used to place and compact the coarse gravel shall be not travel <br />directly on the underlying geomembrane. <br />3. The EARTHWORK CONTRACTOR shall use low ground pressure <br />equipment to place the coarse gravel. A minimum thickness of 1 ft of <br />material is required between a low ground pressure dozer (such as a wide <br />pad Caterpillar D-3 bulldozer or equivalent) and an underlying geoembrane. <br />A minimum thickness of 3 ft of material is required between rubber -tired <br />vehicles and underlying geosynthetics. In areas of heavy vehicle traffic, <br />such as access ramps, the material thickness should be at least 3 ft. In any <br />case, the following table shall be complied with during construction: <br />3 <br />0 <br />Maximum <br />Equipment Ground Pressure <br />(psi) <br />Initial Lift Thickness <br />(ft) <br />< 5 <br />0.5 <br />5 <br />1.0 <br />10 <br />1.5 <br />20 <br />2.0 <br />>20 <br />>3.0 <br />Method of dumping and spreading materials shall be approved by the <br />QA/QC CONSULTANT and shall ensure uniform distribution of the <br />material and prevent damage to the underlying geotextile and geomembrane <br />lining. Approval does not absolve the EARTHWORK CONTRACTOR of <br />responsibility for damage to underlying components. <br />Compaction of Coarse Gravel shall be accomplished by shovel -slicing <br />during dumping, and taking necessary precautions to prevent damage to <br />underlying geosynthetics. <br />C. Quality Control: <br />1. General: As the Coarse Gravel material is being placed, the QA/QC <br />CONSULTANT will be monitoring the construction activities and soil <br />properties. If acceptance tests conducted by the QA/QC CONSULTANT <br />indicate that the Coarse Gravel does not meet specified requirements, the <br />EARTHWORK CONTRACTOR shall terminate material placement until <br />corrective measures are taken. <br />2. Coarse Gravel Acceptance: Final acceptance of the Coarse Gravel will be <br />based on all tests made on completed Work or on samples of material taken <br />from the completed layer. Testing for final acceptance shall be performed <br />by the QA/QC CONSULTANT in accordance with these Specifications and <br />the CQA Manual. <br />Forward Landfill WMU FU -06 <br />02300 20 EARTHWORK <br />C <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.