My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Protection: <br />1. Do not route construction traffic on top of Coarse Gravel layer once <br />material has been placed. <br />2. Constructed Coarse Gravel layer shall be maintained to meet the <br />requirements of this Specification until final completion and acceptance of <br />the Work. This shall include all measures to prevent erosion. During <br />seasonal or other extended shutdowns, all exposed surfaces shall be <br />protected as detailed in Article 3.1, PROTECTION OF EXPOSED <br />SURFACES, of this Section. In addition, the Coarse Gravel shall be <br />protected from any contamination that reduces the hydraulic conductivity. <br />Any contaminated material shall be removed and replaced at no cost to the <br />OWNER. <br />3.12 CONSTRUCTION OF GRANULAR DRAINAGE MATERIAL <br />A. General Requirements: <br />Forward Landfill WMU FU -06 <br />02300 21 EARTHWORK <br />1. GDM shall be placed and compacted to the lines and grades shown on the <br />Construction Drawings or as required by the DESIGN ENGINEER. <br />2. The CONTRACTOR shall notify the OWNER at least 3 working days in <br />advance of when the granular drainage material is completed and ready for <br />as -built surveys. The OWNER will survey the top of the GDM within two <br />days of the layer being completed to determine that the required minimum <br />thickness has been achieved. The survey shall be performed in accordance <br />with Section 01410, SURVEYS, and shall provide coordinates and <br />elevations of the surface at the established 75 -foot grid and delineating <br />prominent features such as the edge of GDM. The EARTHWORK <br />CONTRACTOR may use an alternative method for measuring the thickness <br />of the GDM, with prior written approval of the OWNER and QA/QC <br />CONSULTANT. The QA/QC CONSULTANT shall have 2 working days <br />to review survey results and may independently verify survey results. The <br />time taken by the CQA Team in checking and verifying the survey results <br />will be considered included in the total calendar days allotted the <br />EARTHWORK CONTRACTOR before liquidated damages are assessed. <br />The results of the survey shall be provided to the QA/QC CONSULTANT <br />for approval prior to placing the overlying materials. <br />3. A leak location test will be performed on the geomembrane before and after <br />placement of the granular drainage material and protective operations layer. <br />The GEOSYNTHETICS CONTRACTOR shall be responsible for repairing <br />all identified leaks in the geomembrane prior to placement of the overlying <br />earthwork and geosynthetic materials. The EARTHWORK <br />CONTRACTOR shall be responsible for repairing all identified leaks in the <br />geomembrane following placement of the overlying earthwork and <br />geosynthetic materials. The EARTHWORK CONTRACTOR shall remove <br />all earthwork and geosynthetic materials overlying the geomembrane to the <br />extent required to repair the leak and shall repair all identified leaks in the <br />geomembrane at his sole expense. Following the repair of the leak in the <br />geomembrane, the EARTHWORK CONTRACTOR shall replace all <br />Forward Landfill WMU FU -06 <br />02300 21 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.