My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Placement of granular drainage materials on the geomembrane shall not <br />proceed when the ambient temperature is less than 40 degrees F or more <br />than 104 degrees F, unless approved by the QA/QC CONSULTANT. <br />9. Placement of granular drainage materials on the geomembrane shall be <br />halted when wrinkling of the geomembrane becomes excessive enough, in <br />the opinion of the QA/QC CONSULTANT, to damage the geomembrane. <br />The EARTHWORK CONTRACTOR will not be compensated for any costs <br />or delays resulting from this halt in Work and shall schedule granular <br />drainage material placement at times when wrinkling of the geomembrane, <br />in the opinion of the QA/QC CONSULTANT, is minimal. Approval by the <br />QA/QC CONSULTANT of appropriate times for GDM placement does not <br />absolve EARTHWORK CONTRACTOR of responsibility for repairing any <br />geomembrane lining material damages during GDM placement, at <br />EARTHWORK CONTRACTOR's sole expense. <br />C. Compaction Requirements: Compact using a minimum of two passes of a low <br />ground pressure dozer (see Section 3.12.B.5), unless otherwise approved by the <br />QA/QC CONSULTANT or DESIGN ENGINEER prior to start of the Work. <br />Approval does not absolve the EARTHWORK CONTRACTOR of <br />responsibilities for damage to the underlying geomembrane lining, at the <br />EARTHWORK CONTRACTOR's sole expense. <br />D. Quality Control: <br />1. General: As the GDM is being placed, the QA/QC CONSULTANT will be <br />monitoring the construction activities and soil properties. If tests conducted <br />by the QA/QC CONSULTANT indicate that the GDM does not meet <br />specified requirements, the EARTHWORK CONTRACTOR shall <br />terminate material placement until corrective measures are taken. <br />2. GDM Acceptance: Final acceptance of the GDM will be based on all tests <br />made on completed Work on material samples taken from the completed <br />layer, on leak location testing and repair, and on thickness as determined by <br />the top of Clay Liner and top of GDM surveys. Testing for final acceptance <br />shall be performed by the QA/QC CONSULTANT in accordance with <br />these Specifications and the CQA Manual. <br />E. Protection: <br />1. Do not route construction traffic on top of GDM once material has been <br />placed. <br />2. Constructed GDM shall be maintained to meet the requirements of this <br />Specification until final completion and acceptance of the Work. This shall <br />include all measures to prevent erosion. During seasonal or other extended <br />shutdowns, all exposed surfaces shall be protected as detailed in Article 3.1 <br />of this Section. In addition, the GDM shall be protected from any <br />contamination that reduces the hydraulic conductivity. Any contaminated <br />materials shall be removed and replaced at no cost to the OWNER. <br />Forward Landfill WMU FU -06 <br />02300 23 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.