My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.13 GEOTEXTILE <br />A. The EARTHWORK CONTRACTOR shall place filter geotextile around coarse <br />gravel and above granular drainage material layer in accordance with <br />Section 02771, GEOTEXTILES, of these Specifications. <br />3.14 PROTECTIVE OPERATIONS LAYER <br />A. General Requirements: <br />1. Protective Operations Layer shall be constructed of generally sandy <br />materials excavated onsite and shall be placed and compacted to the lines <br />and grades shown on the Construction Drawings or as required by the <br />QA/QC CONSULTANT. <br />2. Place protective operations to a height of approximately 10 -ft (measured <br />vertically from the base) on lined slopes. <br />3. If any portion of the materials placed as Protective Operations Layer does <br />not meet the specified requirements, the EARTHWORK CONTRACTOR <br />shall remove such material and replace it with materials meeting the <br />Specification at no additional cost to the OWNER. <br />4. The constructed Protective Operations Layer shall be maintained to meet the <br />requirements of this Specification until final completion and acceptance of <br />the Work. This shall include all measures to prevent erosion. During <br />seasonal or other extended shutdowns, all exposed surfaces shall be <br />protected with special treatments specified in Article 3. 1, PROTECTION <br />OF EXPOSED SURFACES, above. <br />5. The EARTHWORK CONTRACTOR shall repair any geotextile or <br />Geocomposite damaged during fill placement at no cost to the OWNER. <br />6. Additional cover of Protective Operations Layer shall be provided over the <br />granular drainage material encapsulating the HDPE piping. For crossing <br />points, the area above the perforated leachate collection pipe shall be <br />covered with a minimum of 2.5 feet of Protective Operations Layer. <br />7. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br />working days in advance of when a layer is completed and ready for as -built <br />surveys. The OWNER will perform the as -built survey of the top of the <br />Protective Operations Layer to determine that the required minimum <br />thickness has been achieved. The survey shall be performed in accordance <br />with Section 01410, SURVEYS, and shall provide coordinates and <br />elevations of the surface at the established 75 -foot grid and delineating <br />prominent features such as the edge of GDM. The QA/QC CONSULTANT <br />shall have 2 working days to review survey results and may independently <br />verify survey results. The time taken by the CQA Team in checking and <br />verifying the survey results will be considered included in the total calendar <br />days allotted the EARTHWORK CONTRACTOR before liquidated <br />damages are assessed. <br />8. A leak location test will be performed on the geomembrane before and after <br />placement of the granular drainage material and protective operations layer. <br />The GEOSYNTHETICS CONTRACTOR shall be responsible for repairing <br />all identified leaks in the geomembrane prior to placement of the overlying <br />Forward Landfill WMU FU -06 <br />02300 24 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.