3.13 GEOTEXTILE <br />A. The EARTHWORK CONTRACTOR shall place filter geotextile around coarse <br />gravel and above granular drainage material layer in accordance with <br />Section 02771, GEOTEXTILES, of these Specifications. <br />3.14 PROTECTIVE OPERATIONS LAYER <br />A. General Requirements: <br />1. Protective Operations Layer shall be constructed of generally sandy <br />materials excavated onsite and shall be placed and compacted to the lines <br />and grades shown on the Construction Drawings or as required by the <br />QA/QC CONSULTANT. <br />2. Place protective operations to a height of approximately 10 -ft (measured <br />vertically from the base) on lined slopes. <br />3. If any portion of the materials placed as Protective Operations Layer does <br />not meet the specified requirements, the EARTHWORK CONTRACTOR <br />shall remove such material and replace it with materials meeting the <br />Specification at no additional cost to the OWNER. <br />4. The constructed Protective Operations Layer shall be maintained to meet the <br />requirements of this Specification until final completion and acceptance of <br />the Work. This shall include all measures to prevent erosion. During <br />seasonal or other extended shutdowns, all exposed surfaces shall be <br />protected with special treatments specified in Article 3. 1, PROTECTION <br />OF EXPOSED SURFACES, above. <br />5. The EARTHWORK CONTRACTOR shall repair any geotextile or <br />Geocomposite damaged during fill placement at no cost to the OWNER. <br />6. Additional cover of Protective Operations Layer shall be provided over the <br />granular drainage material encapsulating the HDPE piping. For crossing <br />points, the area above the perforated leachate collection pipe shall be <br />covered with a minimum of 2.5 feet of Protective Operations Layer. <br />7. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br />working days in advance of when a layer is completed and ready for as -built <br />surveys. The OWNER will perform the as -built survey of the top of the <br />Protective Operations Layer to determine that the required minimum <br />thickness has been achieved. The survey shall be performed in accordance <br />with Section 01410, SURVEYS, and shall provide coordinates and <br />elevations of the surface at the established 75 -foot grid and delineating <br />prominent features such as the edge of GDM. The QA/QC CONSULTANT <br />shall have 2 working days to review survey results and may independently <br />verify survey results. The time taken by the CQA Team in checking and <br />verifying the survey results will be considered included in the total calendar <br />days allotted the EARTHWORK CONTRACTOR before liquidated <br />damages are assessed. <br />8. A leak location test will be performed on the geomembrane before and after <br />placement of the granular drainage material and protective operations layer. <br />The GEOSYNTHETICS CONTRACTOR shall be responsible for repairing <br />all identified leaks in the geomembrane prior to placement of the overlying <br />Forward Landfill WMU FU -06 <br />02300 24 EARTHWORK <br />