My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The polyethylene resin shall meet or exceed the requirements of <br />ASTM D3350 for PE 3408 material with a cell classification of 345464C, <br />or better and a material classification of III C5 PA Driscopipe of <br />Richardson, TX, Model Driscopipe 1000 pipe and Plexco of Benseville, IL, <br />Model Plexco PE 3408 Industrial Piping meet these regirements. <br />2. The polyethylene compound shall be suitably protected against degradation <br />by ultraviolet light by means of carbon black, well dispersed by <br />precompounding in a concentration of not less than 2 percent. <br />3. The maximum allowable hoop stress shall be 800 psi at 73.4° F. <br />4. The pipe manufacturer shall be listed with the Plastic Pipe Institute as <br />meeting the recipe and mixing requirements of the resin manufacturer for <br />the resin used to manufacture the pipe for this project. <br />5. Pipe sizes shall conform to ASTM F714. <br />6. The pipe shall conform to the following schedule: <br />7. <br />2.2 FITTINGS <br />Perforate 3 -inch pipe with 1/4 -inch holes and 6 and 18 -inch pipes with 1/2 - <br />inch diameter holes drilled on thirds, spaced 6 -inches on center. <br />A. Polyethylene fittings shall be molded for sizes 6 -inch and smaller and shall be <br />fabricated from polyethylene pipe for sizes 8 -inch and larger, by means of thermal <br />butt -fusion. The ends of the fabricated fittings shall not be trimmed to match the <br />pipe section to which they are going to be joined. All polyethylene fittings shall <br />have the same or higher pressure rating as the pipe when installed in accordance <br />with the latest technical specifications. <br />2.3 JOINTS <br />A. Thermal butt -fusion, except where connecting to unions, valves, and equipment <br />with threaded connections that may require future disassembly. <br />Forward Landfill WMU FU -06 <br />02535 2 LEACHATE PIPES <br />0 <br />r� <br />n <br />Piping System and/or <br />Nominal Pipe <br />Location <br />SDR <br />Size <br />3 inch <br />Perforated and Solid <br />11 <br />Leachate Collection and <br />Header Pipes <br />6 inch <br />Perforated Leachate <br />11 <br />Collection Pipes <br />18 inch <br />Solid and Perforated <br />11 <br />Leachate Riser Pipe <br />Perforate 3 -inch pipe with 1/4 -inch holes and 6 and 18 -inch pipes with 1/2 - <br />inch diameter holes drilled on thirds, spaced 6 -inches on center. <br />A. Polyethylene fittings shall be molded for sizes 6 -inch and smaller and shall be <br />fabricated from polyethylene pipe for sizes 8 -inch and larger, by means of thermal <br />butt -fusion. The ends of the fabricated fittings shall not be trimmed to match the <br />pipe section to which they are going to be joined. All polyethylene fittings shall <br />have the same or higher pressure rating as the pipe when installed in accordance <br />with the latest technical specifications. <br />2.3 JOINTS <br />A. Thermal butt -fusion, except where connecting to unions, valves, and equipment <br />with threaded connections that may require future disassembly. <br />Forward Landfill WMU FU -06 <br />02535 2 LEACHATE PIPES <br />0 <br />r� <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.