Laserfiche WebLink
E, <br />A. Geosynthetic clay liners shall be supplied in rolls wrapped in liquid impermeable <br />and opaque protective covers. <br />B. Geosynthetic clay liners shall be marked or tagged with the following information: <br />1. manufacturer's name; <br />2. product identification; <br />3. lot number; <br />4. roll number; and <br />5. roll dimensions. <br />C. Transportation of the prefabricated geosynthetic clay liner is the responsibility of the <br />GEOSYNTHETICS CONTRACTOR. The GEOSYNTHETICS CONTRACTOR <br />shall be liable for all damages to the materials incurred prior to and during <br />transportation to the site. <br />1.7 DELIVERY, STORAGE, AND PROTECTION <br />A. Delivery. <br />1. Deliver materials to the site only after the QA/QC CONSULTANT accepts <br />required submittals. <br />2. Separate damaged rolls from undamaged rolls and store at locations <br />designated by the OWNER until proper disposition of material is <br />determined by the QA/QC CONSULTANT and the OWNER. <br />3. The GEOSYNTHETICS CONTRACTOR shall be responsible for damage <br />to the GCL during delivery, even if the rolls are unloaded by the <br />EARTHWORK CONTRACTOR. The QA/QC CONSULTANT will <br />determine damage. <br />B. Handling, storage, and care of the geosynthetic clay liner, prior to and following <br />installation, is the responsibility of the GEOSYNTHETICS CONTRACTOR, until <br />Final Acceptance of the liner system by the OWNER. <br />C. The GCL shall be protected from moisture, excessive heat or cold, puncture, or <br />other damaging or deleterious conditions. The GCL shall be stored off the ground <br />and out of direct sunlight. Any additional storage procedures required by the <br />manufacturer shall be the GEOSYNTHETICS CONTRACTOR'S responsibility. <br />1.8 SEQUENCING AND SCHEDULING <br />A. A pre -installation meeting shall be held to coordinate the installation of the <br />geosynthetic clay liner with the installation of other components of the lining <br />system. <br />B. The geosynthetic clay liner shall be on-site fourteen days prior to the scheduled <br />installation date to allow for completion of acceptance testing. <br />Forward Landfill WMU FU -06 3 GEOSYNTHETIC CLAY LINER (GCL) <br />02777 <br />