My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. The GCL shall be constructed concurrently with the HDPE Geomembrane and shall <br />be completely covered with completed HDPE geomembrane at the end of each <br />working day. GCL panel placement shall not precede HDPE geomembrane panel <br />placement by more than four GCL panels. <br />PART 2 PRODUCTS <br />2.1 PROPERTIES <br />A. The GCL shall have the following properties. <br />Table 02777-1 <br />Properties for Geosynthetic Clay Liner <br />Property <br />Test Method <br />Test Frequency <br />Required Values <br />Bentonite Swell Index <br />ASTM D 5890 <br />1 per 100,000 lb <br />24 mL/2g min. <br />Bentonite Fluid Loss <br />ASTM D 5891 <br />1 per 100,000 lb <br />18 mL max. <br />Bentonite Mass/Area <br />ASTM D 5993 <br />40,000 sf <br />0.75 lb/sf <br />ASTM D 4632 <br />150 lbs <br />GCL Tensile Strength <br />40,000 sf <br />ASTM D 6768 <br />45 lbs/in <br />ASTM D 4632 <br />35 lbs <br />GCL Peel Strength <br />40,000 sf <br />ASTM D 6496 <br />5.3 lbs/in <br />GCL Index Flux <br />ASTM D 5887 <br />2 per project <br />1 x 10-8 m3/m2/sec max <br />GCL Hydraulic Conductivity <br />ASTM D 5887 <br />1 per week <br />5 x 10-9 cm/sec max <br />Interface Shear Strength <br />(post -peak) <br />7' <br />GCL/Geomembrane/Protective <br />ASTM D6243 <br />1 per project <br />Operations Layer Soil' <br />c = 0 psf <br />Notes: <br />' The interface shear strength testing will be performed by the QA/QC CONSULTANT. <br />1. The GCL shall consist of a layer of bentonite encapsulated between two <br />Forward Landfill WMU FU -06 4 GEOSYNTHETIC CLAY LINER (GCL) <br />02777 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.