Laserfiche WebLink
L' <br />GEOCOMPOSITE <br />DRAINAGE NET <br />1L-:7 <br />APPROX 2 <br />GEOSYNTHETIC <br />CLAY LINER -� <br />60 -mil SINGLE TEXTURED <br />HDPE GEOMEMBRANE <br />(SEE NOTE 2) <br />BENCH BERM _ <br />3 <br />1� <br />SUBGRADE FILL OR <br />EXISTING GRADE <br />1s _1 � MSN <br />SECTION 1 j <br />SLOPE BENCH SHT 3 <br />NTS <br />FILL <br />SEE DETAIL r2-� <br />GEOCOMPOSITE <br />i------------------ <br />OTECTIVE <br />DRAINAGE NET <br />SHT 6 <br />WMU FUS 3, WELD EXISTING \ <br />60 -mil DOUBLE TEXTURED 60-mll DOUBLE TEXTURED <br />(SEE NOTE 4) <br />ERATIONS LAYER <br />T MIN <br />HDPE GEOMEMBRANEMIN HDPE GEOMEMBRANE <br />r GEOCOMPOSITE <br />PROTECTIVE <br />/ <br />( DRAINAGE NET <br />E NOTE 1) <br />OPERATIONS LAYER <br />( 1 60 -mil TEXTURED <br />r ' <br />" PERFORATED <br />HDPE GEOMEMBRANE <br />FILTER GEOTEXTILE <br />( <br />I <br />LVMIN <br />HDPE LEACHATE <br />(SEE NOTE 6) <br />FILL GEOSYNTHETIC <br />COLLECTION PIPE <br />CLAY LINER <br />GRANULAR DRAINAGE <br />WMU FU EXISTING <br />/ <br />\ <br />MATERIAL <br />\ T <br />WMU FU -06 <br />WMU FU -05 <br />CLAY LINER MIN CLAY LINER <br />SECTION <br />8) (NOTE 8) <br />SIDE SLOPE LINER CONNECTION SHT 3,41, 11 <br />\(NOTE <br />NTS <br />- - <br />o•• <br />V/// <br />u0.�� c <br />' _ <br />VMIN <br />EDGE OF EXISTING <br />GEOMEMBRANE <br />5 IN <br />T MIN <br />/ <br />T MIN <br />APPROXEXISTNGFILR <br />EXTRUSION WELD / <br />60 mil DOUBLE TEXTURED <br />REMOVE EXISTING GEOTlEXTiLET <br />HDPE GEOMEMBRANE <br />PROTECTIVE <br />PLYWOOD SHEE I ING AND <br />CLAY LINER <br />OPERATION LAYER <br />PROTECTIVE GEOTEXTILE EXISTING PROTECTIVE <br />10' MIN APPROX. 1T <br />FILTER GEOTEXTILE <br />GENERAL OPERATIONS LAYER <br />CUSHION <br />(SEE NOTE 7) <br />z EARTH FILL 3 <br />GEOTEXTILE <br />2% APPROX 1 <br />t <br />o <br />:�- <br />SECTION�'� <br />H <br />GRANULAR <br />I 1% �. <br />�- <br />NORTH SIDE SLOPE LINER - BASE LINER TRANSITION <br />SHT 3 <br />DRAINAGEVARIES <br />NTS <br />MATERIAL`- <br />- _ J }} 5 ' <br />CLAY LINER <br />60 -mil DOUBLE TEXTURED <br />CUSHION EDGEOF tY <br />GEOTEXTILE EXISTING <br />CLAY LINER � EXISTING i <br />PROTECTIVE <br />HDPE GEOMEMBRANE <br />CUSHION - <br />BLASTIC COVERING <br />GEOTEXTILE l <br />(BY OWNER) <br />\\\ <br />GEOCOMPOSITE <br />(NOTE 3} <br />WMU FU -06 WMU FU -05 <br />DRAINAGE NET <br />SECTION �IV11 <br />2% <br />- <br />CONNECTS! TO EXISTING LINER SYSTEM SHT 4 <br />NTS <br />2% <br />60 mil SINGLE SIDE TEXTURED <br />HDPE GEOMEMBRANE <br />- t5 <br />GEOSYNTHETIC <br />MIN <br />CLAY LINER <br />1s _1 � MSN <br />SECTION 1 j <br />SLOPE BENCH SHT 3 <br />NTS <br />FILL <br />NOTES: <br />1. THE FIRST IV OF SIDE SLOPE PROTECTIVE OPERATION LAYER SHALL BE PLACED <br />BY THE CONTRACTOR USING A WHEELED LOADER WITH NO EQUIPMENT LOADING ON <br />THE SLOPE. SUBSEQUENT LIFTS OF SIDE SLOPE PROTECTIVE OPERATIONS LAYER <br />SHALL BE PLACED BY THE OWNER IN CONJUCTION WITH WASTE PLACEMENT TO A <br />MAXIMUM HEIGHT OF 10' ABOVE THE LEVEL OF REFUSE. SUBSEQUENT LIFTS SHALL <br />ALSO BE PLACED WITH A WHEELED LOADER. <br />2. PLACE TEXTURED SIDE OF GEOMEMBRANE AGAINST CLAY LINER OR GCL. <br />3. OWNER SHALL PLACE A PROTECTIVE PLASTIC COVERING OVER THE GEOCOMPOSITE <br />DRAINAGE NET. THE PROTECTIVE PLASTIC COVERING SHALL BE REMOVED (BY OWNER) <br />BEFORE THE SIDE SLOPE OPERATIONS LAYER IS PLACED AGAINST THE GEOCOMPOSITE <br />DRAINAGE NET. THE SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE PLACED <br />IN CONJUNCTION WITH WASTE PLACEMENT (BY OWNER). TO A MAXIMUM HEIGHT OF IV <br />ABOVE THE LEVEL OF REFUSE. THE OWNER SHALL PLACE THE SIDE SLOPE OPERATIONS <br />LAYER USING A WHEEL LOADER, WITH NO EQUIPMENT LOADING ON THE SLOPE. OWNER <br />SHALL PROVIDE TEMPORARY ANCHORING OF PROTECTIVE PLASTIC COVERING. TEMPORARY <br />ANCHORAGE SHALL NOT DAMAGE UNDERLYING LINER <br />4. OVERLAP NEW WMU FU -06 GEOCOMPOSITE DRAINAGE NET AND EXISTING UNDAMAGED <br />WMU FU -05 GEOCOMPOSITE DRAINAGE NET A MINIMUM OF 3 FEET AND SEAM. ON SOUTH SLOPE <br />OF SOUTHERN PORTION OF WMU FUS, TERMINATE GEOCOMPOSITE DRAINAGE NET AT <br />EASTHERN EDGE OF WMU FU -05. <br />5. CONTINUALLY WELD NEW, WMU FU -W HDPE GEOMEMBRANE TO EXISTING UNDAMAGED <br />WMU FU -05 HDPE GEOMEMBRANE. <br />6. OVERLAP NEW WMU FU -06 GEOSYNTHETIC CLAY LINER AND EXISTING UNDAMAGED WMU FU -05 <br />GEOSYNTHETIC CLAY LINER A MINIMUM OF 3 FEET. <br />7. OVERLAP EXISTING UNDAMAGED GEOTEXTILE AND WMU FU -06 GEOTEXTILE A MINIMUM OF 2 FEET. <br />8. KEY NEW CLAY LINER INTO EXISTING CLAY LINER. <br />i WASTE <br />j FILL SLOPE <br />1° MIN <br />1' MIN <br />T MIN <br />EXISTBNG <br />GRANULAR DRAINAGE <br />MATERIAL <br />EXISTING <br />60-nA DOUBLE TEXTURED <br />HDPE GEOMEMBRANE <br />EXISTING <br />CLAY LINER <br />60-mii TEXTURED <br />GEOCOMPOSITE <br />HDPE GEOMEMBRANE <br />DRAINAGE NET <br />(SEE NOTE 5) <br />(SEE NOTE 4) <br />T MIN <br />r GEOCOMPOSITE <br />( DRAINAGE NET <br />If) IRE <br />( 1 60 -mil TEXTURED <br />GEOSYNTHETIC ' <br />HDPE GEOMEMBRANE <br />CLAY LINER <br />SUBGRADE <br />(SEE NOTE 6) <br />FILL GEOSYNTHETIC <br />CLAY LINER <br />BACKFILL WITH <br />is <br />SLURRY CEMENT <br />MIXTURE <br />WMU FU -06 <br />WMU FU -05 <br />SECTION <br />SIDE SLOPE LINER CONNECTION SHT 3,41, 11 <br />NTS <br />NOTES: <br />1. THE FIRST IV OF SIDE SLOPE PROTECTIVE OPERATION LAYER SHALL BE PLACED <br />BY THE CONTRACTOR USING A WHEELED LOADER WITH NO EQUIPMENT LOADING ON <br />THE SLOPE. SUBSEQUENT LIFTS OF SIDE SLOPE PROTECTIVE OPERATIONS LAYER <br />SHALL BE PLACED BY THE OWNER IN CONJUCTION WITH WASTE PLACEMENT TO A <br />MAXIMUM HEIGHT OF 10' ABOVE THE LEVEL OF REFUSE. SUBSEQUENT LIFTS SHALL <br />ALSO BE PLACED WITH A WHEELED LOADER. <br />2. PLACE TEXTURED SIDE OF GEOMEMBRANE AGAINST CLAY LINER OR GCL. <br />3. OWNER SHALL PLACE A PROTECTIVE PLASTIC COVERING OVER THE GEOCOMPOSITE <br />DRAINAGE NET. THE PROTECTIVE PLASTIC COVERING SHALL BE REMOVED (BY OWNER) <br />BEFORE THE SIDE SLOPE OPERATIONS LAYER IS PLACED AGAINST THE GEOCOMPOSITE <br />DRAINAGE NET. THE SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE PLACED <br />IN CONJUNCTION WITH WASTE PLACEMENT (BY OWNER). TO A MAXIMUM HEIGHT OF IV <br />ABOVE THE LEVEL OF REFUSE. THE OWNER SHALL PLACE THE SIDE SLOPE OPERATIONS <br />LAYER USING A WHEEL LOADER, WITH NO EQUIPMENT LOADING ON THE SLOPE. OWNER <br />SHALL PROVIDE TEMPORARY ANCHORING OF PROTECTIVE PLASTIC COVERING. TEMPORARY <br />ANCHORAGE SHALL NOT DAMAGE UNDERLYING LINER <br />4. OVERLAP NEW WMU FU -06 GEOCOMPOSITE DRAINAGE NET AND EXISTING UNDAMAGED <br />WMU FU -05 GEOCOMPOSITE DRAINAGE NET A MINIMUM OF 3 FEET AND SEAM. ON SOUTH SLOPE <br />OF SOUTHERN PORTION OF WMU FUS, TERMINATE GEOCOMPOSITE DRAINAGE NET AT <br />EASTHERN EDGE OF WMU FU -05. <br />5. CONTINUALLY WELD NEW, WMU FU -W HDPE GEOMEMBRANE TO EXISTING UNDAMAGED <br />WMU FU -05 HDPE GEOMEMBRANE. <br />6. OVERLAP NEW WMU FU -06 GEOSYNTHETIC CLAY LINER AND EXISTING UNDAMAGED WMU FU -05 <br />GEOSYNTHETIC CLAY LINER A MINIMUM OF 3 FEET. <br />7. OVERLAP EXISTING UNDAMAGED GEOTEXTILE AND WMU FU -06 GEOTEXTILE A MINIMUM OF 2 FEET. <br />8. KEY NEW CLAY LINER INTO EXISTING CLAY LINER. <br />i WASTE <br />j FILL SLOPE <br />1° MIN <br />1' MIN <br />T MIN <br />EXISTBNG <br />GRANULAR DRAINAGE <br />MATERIAL <br />EXISTING <br />60-nA DOUBLE TEXTURED <br />HDPE GEOMEMBRANE <br />EXISTING <br />CLAY LINER <br />