Laserfiche WebLink
C7 <br />C� <br />FILTER <br />GEOTEXTILE <br />PROTECTIVE OPERATIONS LAYER <br />2'MIN� <br />00 0 0 <br />0 0 <br />GRANULAR DRAINAGE MATERIAL <br />CUSHION <br />GEOTDCI'ILE <br />60•md SINGLE TEXTURED <br />g 0 00 00 "- <br />HDPE GEOMEMBRANE <br />GEOSYNTHETIC CLAY LINER <br />6D -m8 DOUBLE <br />GENERAL EARTHFILL <br />TEXTURED HDPE <br />COARSE GRAVEL <br />GEOMEMBRANE <br />CUSHION <br />HDPE GEOMEMBRANE <br />GEOTEXTILE <br />MIN <br />1. MINF <br />11 MIN <br />POROUS <br />Oo—ooI <br />r o6 06 0o 0o o o0 o0 o o <br />7 MHN <br />oo ee "u <br />WELD <br />SMM <br />it = _ _=oo o <br />CLAY LINER <br />60-mll SINGLE TEXTURED <br />HDPE GEOMEMBRANE <br />GEOSYNTHETIC <br />18' HDPE LONG <br />CLAY LINER <br />RADIUS ELBOW <br />CUSHION <br />GEOTEXTILE <br />18-WM PERFORATED <br />HDPE LEACHATE RISER PIPE <br />W/FLANGE CAP <br />(SEE NOTE 5) <br />FILTER <br />60 -mil DOUBLE TEXTURED <br />HDPE GEOMEMBRANE <br />W PERFORATED <br />18 -INCH NONPERFORATI <br />HDPE RISER PIPE <br />SEE NOTE <br />GEOCOMPOSITE- <br />DRAINAGE NET <br />SEE NOTE 1- <br />SEE NOTE 4 <br />FLANGE CAP <br />-a1, AMA► <br />i <br />NOTE <br />184NCH NONPERFORATED <br />HDPE LEACHATE RISER PIPE <br />CUSHION <br />�AGESEE NOTE 3) <br />GEOCZPZE <br />DRAINAGE NET <br />\ 60•m0 SINGLE TEXTURED GEOSYNTHETIC <br />HDPE GEOMEM CLAY LINER <br />SECTION - PRIMARY LEACHATE RISER PIPE <br />SECTION m <br />LEACHATE RISER AND SUMP SHT 4 <br />NTS (SEE NOTE 2,7) <br />PROTECTIVE OPERATIONS LAYER <br />- GRANULAR DRAINAGE MATERIAL <br />60 -mil SINGLE TEXTURED <br />HDPE GEOMEMBRANE <br />GEOSYNTHETIC CLAY LINER <br />GENERAL EARTHFILL <br />_COARSE GRAVEL <br />60-rnH SINGLE TEXTURED <br />HOPE GEOMEMBRANE— <br />18 -INCH NONPERFORATED <br />HDPE RISER PIPE <br />CUSHION <br />GEOTEXTILE <br />(SEE NOTE 3) <br />GEOSYNTHETIC <br />CLAY LINER <br />PROTECTIVE <br />VAULT BOX <br />SEE NOTE 6 <br />\� GEOCOMPOSITE <br />DRAINAGE NET <br />LYSIMETERLEADS \® <br />AND PROTECTIVE CASING <br />6G4M SINGLE TEXTURED <br />HDPE GEOMEMBRANE <br />GEOSYNTHETIC CLAY LINER <br />SECTION AL1 <br />TYPICAL SUMP AND LYSIMETER SHT4 <br />NTS <br />NOTES: <br />1. PROVIDE EXTRA 1 FOOT OF COVER OVER RISER PIPE <br />2. PLACE BOLLARDS AROUND END OF RISER PIPE FOR PROTECTION FROM TRAFFIC. <br />3. PLACE TWO ADDITIONAL SHEETS OF CUSHION GEOTEXTR.EBELOW LEACHATE RISER PIPE <br />TO PROTECT GECOMPOSITE DRAINAGE NET. <br />4. CONTRACTOR TO PROVIDE RISER GUIDE TO PREVENT LATERAL PIPE MOVEMENT <br />BUT PERMrMNG EXPANSIONICONTRACTION. <br />5. PERFORATION PATTERN: Yz - INCH DIAMETER HOLES AT PIPE THIRD <br />POINTS, SPACED 6 -INCHES ON CENTER. <br />6. USE HDPE BOOT TO ALLOW PENETRATION OF LYSIMETER PROTECTIVE CASING <br />OR RISER PIPE THROUGH GEOSYNTHETI S. <br />7. OFFSET PRIMARY AND SECONDARY RISER PIPES BY APPROXIMATELY 5 -FT. <br />8. USE SINGLE SIDE TEXTURED HDPE GEOMEMBRANE WITH TEXTURED SIDE <br />PLACED AGAINST GEOSYNTHEfIC CLAY LINER <br />9. BELOW APPROX. ELEVATION 3S, THE MATERIAL UNDERLYING THE INTERFACE LINER IS <br />EITHER NATIVE GROUND OR GENERAL EARTH FILL AND NO SUBGRADE FILL IS REQUIRED. <br />10. OWNER SHALL PLACE A PROTECTIVE PLASTIC COVERING OVER THE GEOCOMPOSITE <br />DRAINAGE NET. THE PROTECTIVE PLASTIC COVERING SHALL. BE REMOVED (BY OWNER) <br />BEFORE THE SIDE SLOPE OPERATIONS LAYER S PLACED AGAINST THE GEOCOMPOSME <br />DRAINAGE NET. THE SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE PLACED IN <br />CONJUNCTION WITH WASTE PLACEMENT (BY OWNEP4 TO A MAXIMUM HEIGHT OF 1(r ABOVE <br />THE LEVEL OF REFUSE THE OWNER SHALL PLACE THE SIDE SLOPE OPERATIONS LAYER <br />USING A WHEELED LOADER, WITH NO EQUIPMENT LOADING ON THE SLOPE OWNER SHALL <br />PROVIDE TEMPORARY ANCHORING OF PROTECTIVE PLASTIC COVERING. TEMPORARY <br />ANCHORAGE SHALL NOT DAMAGE UNDERLYING LINER <br />GEOCOMPOSITE <br />DRAINAGE NET <br />PLASTIC COVERING <br />(BY OWNER) <br />FUTURE PROTECTIVE (NOTE 10) <br />OPERATIONS LAYER <br />(BY OWNER) \. <br />VARA EXISTING GRADE <br />(VARIES) <br />60 mil SINGE <br />1' REIN TEXTURED HDPE <br />GEOMEMBRANE <br />THICKNESS VARIES FROM (SEE NOTE 8) <br />APPROX 1 -FT TO 5 -FT GEOSYNTHETIC <br />CLAY LINER <br />SUBGRADE FILL <br />EXISTING AUSTIN ROAD <br />LANDFILLCOVER <br />AND REFUSE <br />(SEE NOTE 9) <br />DETAIL t-3-"\ <br />INTERFACE LINER DETAIL SHT 3 <br />NTS <br />..cam <br />2'MIN� <br />00 0 0 <br />0 0 <br />_ <br />0 0 08 <br />0 0 0 0 <br />CUSHION <br />GEOTDCI'ILE <br />S MIN <br />g 0 00 00 "- <br />WELD <br />60 -mil SINGLE TEXTURED <br />CLAY LINER <br />HDPE GEOMEMBRANE <br />GEOSYNTHETIC <br />Z <br />CLAY LINERV <br />POROUS <br />CUSHION <br />SUCTION CUP <br />LYSIMETER <br />60-rnH SINGLE TEXTURED <br />HOPE GEOMEMBRANE— <br />18 -INCH NONPERFORATED <br />HDPE RISER PIPE <br />CUSHION <br />GEOTEXTILE <br />(SEE NOTE 3) <br />GEOSYNTHETIC <br />CLAY LINER <br />PROTECTIVE <br />VAULT BOX <br />SEE NOTE 6 <br />\� GEOCOMPOSITE <br />DRAINAGE NET <br />LYSIMETERLEADS \® <br />AND PROTECTIVE CASING <br />6G4M SINGLE TEXTURED <br />HDPE GEOMEMBRANE <br />GEOSYNTHETIC CLAY LINER <br />SECTION AL1 <br />TYPICAL SUMP AND LYSIMETER SHT4 <br />NTS <br />NOTES: <br />1. PROVIDE EXTRA 1 FOOT OF COVER OVER RISER PIPE <br />2. PLACE BOLLARDS AROUND END OF RISER PIPE FOR PROTECTION FROM TRAFFIC. <br />3. PLACE TWO ADDITIONAL SHEETS OF CUSHION GEOTEXTR.EBELOW LEACHATE RISER PIPE <br />TO PROTECT GECOMPOSITE DRAINAGE NET. <br />4. CONTRACTOR TO PROVIDE RISER GUIDE TO PREVENT LATERAL PIPE MOVEMENT <br />BUT PERMrMNG EXPANSIONICONTRACTION. <br />5. PERFORATION PATTERN: Yz - INCH DIAMETER HOLES AT PIPE THIRD <br />POINTS, SPACED 6 -INCHES ON CENTER. <br />6. USE HDPE BOOT TO ALLOW PENETRATION OF LYSIMETER PROTECTIVE CASING <br />OR RISER PIPE THROUGH GEOSYNTHETI S. <br />7. OFFSET PRIMARY AND SECONDARY RISER PIPES BY APPROXIMATELY 5 -FT. <br />8. USE SINGLE SIDE TEXTURED HDPE GEOMEMBRANE WITH TEXTURED SIDE <br />PLACED AGAINST GEOSYNTHEfIC CLAY LINER <br />9. BELOW APPROX. ELEVATION 3S, THE MATERIAL UNDERLYING THE INTERFACE LINER IS <br />EITHER NATIVE GROUND OR GENERAL EARTH FILL AND NO SUBGRADE FILL IS REQUIRED. <br />10. OWNER SHALL PLACE A PROTECTIVE PLASTIC COVERING OVER THE GEOCOMPOSITE <br />DRAINAGE NET. THE PROTECTIVE PLASTIC COVERING SHALL. BE REMOVED (BY OWNER) <br />BEFORE THE SIDE SLOPE OPERATIONS LAYER S PLACED AGAINST THE GEOCOMPOSME <br />DRAINAGE NET. THE SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE PLACED IN <br />CONJUNCTION WITH WASTE PLACEMENT (BY OWNEP4 TO A MAXIMUM HEIGHT OF 1(r ABOVE <br />THE LEVEL OF REFUSE THE OWNER SHALL PLACE THE SIDE SLOPE OPERATIONS LAYER <br />USING A WHEELED LOADER, WITH NO EQUIPMENT LOADING ON THE SLOPE OWNER SHALL <br />PROVIDE TEMPORARY ANCHORING OF PROTECTIVE PLASTIC COVERING. TEMPORARY <br />ANCHORAGE SHALL NOT DAMAGE UNDERLYING LINER <br />GEOCOMPOSITE <br />DRAINAGE NET <br />PLASTIC COVERING <br />(BY OWNER) <br />FUTURE PROTECTIVE (NOTE 10) <br />OPERATIONS LAYER <br />(BY OWNER) \. <br />VARA EXISTING GRADE <br />(VARIES) <br />60 mil SINGE <br />1' REIN TEXTURED HDPE <br />GEOMEMBRANE <br />THICKNESS VARIES FROM (SEE NOTE 8) <br />APPROX 1 -FT TO 5 -FT GEOSYNTHETIC <br />CLAY LINER <br />SUBGRADE FILL <br />EXISTING AUSTIN ROAD <br />LANDFILLCOVER <br />AND REFUSE <br />(SEE NOTE 9) <br />DETAIL t-3-"\ <br />INTERFACE LINER DETAIL SHT 3 <br />NTS <br />