Laserfiche WebLink
OVERLAP EXISTING APPROX. <br />AND NEW GEOTEXTILE REMOVE EXISTING T REMOVE EXISTING <br />3- <br />A MINIMUM OF FEET 60 MIL HOPE GENERAL EARTHFILL BERM <br />PROTECTIVE GEOMEMBRANE "11PROTECTIVE <br />APPRO IV <br />� 1 -,1, <br />OPERATION LAYER APPROX OPERATION LAYER <br />1! <br />1........ ........ ............ EXISTING VEGETATIVE LAYER <br />O.N <br />-- - - -- - - - - - - - - - - - - <br />lo <br />EXISTING FOUNDATION L <br />GRANULAR DRAINAGE <br />[STING CLAY LINER <br />A <br />MATERIAL FILTER GE L <br />REMOVE EXISTING FILTER <br />GRANULAR DRAINAGE GEOTEXTILE <br />MATERIAL AND REPLACE <br />WITH GENERAL EARTHFILL WESTERN CONNECTION GRANULAR <br />DRAINAGE MATERIAL <br />NTS SHT3 <br />APPROX. TOP DECK <br />3. TERMINATION BERM <br />PROTECTIVE 60 MIL SINGLE TEXTURED rw- I EAFITHFILQ <br />OPERATION LAYER HDPE GEOMEMBRANE 1 -- I APPROX <br />ROX. 4' EXISTING VEGETATIVE LAYER <br />os Tr <br />--A - 4- <br />GRANULAR DRAINAGE <br />/ <br />MATERIAL XAN NG CLAY LINER <br />FILTER GEOTEXTILE <br />EASTERN TERMINATION <br />NTS SHT3 <br />- EXISTING EXISTING NORTHERN 60 MR HDPE <br />ACCESS ROAD fTERMINATION BERM //y- GEOMEMBRANE <br />BURY EDGE OF <br />SHT 3 <br />GEOMEMBRANE60 MR HDPE - 34NCH DIA <br />............................... <br />............................................................. •..— .............. A <br />................................... . ..................... <br />pe.0 .0 ..C6 <br />GEOMEMBRANE PERFORATED HOPE PIPE <br />(NOTE 5) <br />PROTECTIVE <br />EXISTING SOL BERM COARSE <br />OPERATION LAYER <br />GRAVEL-\ <br />-11 i-111177-AMIN-1 I F,i ....... .... ....... .. .................... . <br />1. <br />... ..... .... ....... .... . ... .... .. <br />NTS <br />SHT4 <br />E)us7nNG <br />VEGETATIVE <br />GRANULAR <br />DRAINAGE <br />MATERIAL <br />LAYER <br />F-7 <br />FILTER GEOTEXTILE <br />EXISTMG <br />CLAY LINER <br />SOUTHERN TERMINATION /`S� <br />HDPE PIPE <br />ELBOW JOINT <br />34hr-4 DIA <br />NON PERFORATED <br />ROUTE TO HDPE PIS <br />TEMPORARY <br />LEACHATE TANK <br />SUB <br />rGRADEFILL <br />OPERATION LAYER <br />....... ............ <br />.. . ... ... .. <br />................ <br />1. <br />0-T <br />-- - - - - - - ----- <br />STING VEGETATIVE LAYER GRANULAR DRAINAGE <br />MATERIAL <br />FILTER GEOTEXTILE <br />3 -INCH DLA <br />PERFO <br />NORTHERN TERMINATION AND ACCESS ROAD L -d -� HDPE PPLED <br />SOLID3-INCH DIA <br />HDPE <br />NIS SHT3 PIPE <br />34NCH DIA FILTER GEOTEXTILE <br />PROTECTIVE PERFORATED (NOTE 4) <br />HDPE PIPE GRANULAR DRAINAGE <br />OPERATIONS LAYER MOTES —E GRAVEL MATERIAL <br />o <br />SHT 3 <br />CLAY PLUG BERM <br />(SEE NOTE 2) <br />............................... <br />............................................................. •..— .............. A <br />................................... . ..................... <br />pe.0 .0 ..C6 <br />EXISTING, \ /X� <br />VEGETATIVE LAYt72 � /A 'PROX3" x <br />LANDFILL <br />- - - - - - - - - - <br />(OWNER SUPPLIED) <br />LCRS PIPE SECTION <br />777577 =7 77, 7,/\7/ <br />,7777/7777777 <br />1\ A; <br />LCRS PIPE SECTION <br />NTS SHT 3 <br />FILTER <br />GEOTEXTILE <br />RIDGE OF EXISTING— 1 -60 -mil HDPE <br />SOUTHERNGEOMEMBRANE <br />TERMINATION BERM (Ds CLAY PLUG BEF <br />NTS <br />SHT 3 <br />CLAY PLUG BERM <br />(SEE NOTE 2) <br />60 MR HOPE <br />GEOMEMBRANE <br />CLAY PLUG <br />A(SEENOTE 2) <br />EXISTING TING <br />ING FOUNDATION LAYER <br />VEGETATIVE LAYER <br />EXISTING CLAY LINER <br />SECTION <br />NTS <br />I <br />SOUTH SLOPE OF <br />"--ROUTETO <br />TEMPORARY <br />EXISTING AUSTIN ROAD <br />LEACHATE TANK <br />LANDFILL <br />(OWNER SUPPLIED) <br />LCRS PIPE SECTION <br />NTS <br />SHT4 <br />c <br />WRISER STUB END <br />AND PERFORATED <br />END CAP <br />PROTECTIVE <br />OPERATION LAYER <br />DRAINAGE <br />MATERIAL <br />FILTER GEOTEXTILE <br />.............................. <br />.............................. <br />............................TFVC....................... <br />EE OPE -FILTER GECTEXTIL <br />TFV <br />.......................... ....... <br />. .. . .. ............ <br />................................................................................ . <br />.VS, -0 I-GRANULARDRAINAr.EmAmRLAL--..&,9-1 ------- <br />o <br />7 STI (SEE NOTE 1) <br />/ <br />TYPICAL LINER AND LCRS SECTION <br />NTS SHT 4 <br />NOTES: <br />1. CONTRACTOR SHALL STRIP EXISTING VEGETATION. <br />2. EXTEND CLAY PLUG AND CLAY PLUG BERM APPROXIMATELY 10 -FT IN <br />LENGTH ON EITHER SIDE OF ELBOW INTERSECTION TO TIE IN TO E)asnNG BERM. <br />3. CLAMP HDPE GEOMEMBRANE BOOT TO 34NCH DIA HOPE PIPE USING <br />STAINLESS STEEL CLAMP AND NEOPRENE GASKET. <br />4. OVERLAP GEOTEXTILES 2 -FT AT TOP OF WRAPPED GRAVEL <br />5. PERFORATED 3 -INCH HDPE PIPE WITH Y4 - INCH DIA HOLES AT THIRD <br />POINTS, SPACED 6 -INCHES ON CENTER. <br />