My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:52:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northern Portion of WMU FU-06 August 2006 <br /> Forward Landfill Project No.021605.07 <br /> 2.0 PROJECT DESCRIPTION <br /> 2.1 Project Components of the Northern Portion of WMU FU-06 <br /> The phase of construction described herein consisted of placement of an 8-oz <br /> geotextile, overlain with a 6-inch thick blanket LCRS composed of granular <br /> drainage material, overlain with an additional 8-oz geotextile. A 1-ft protective <br /> operations layer was placed over the blanket LCRS. In addition, a temporary berm <br /> was constructed around the perimeter of the northern portion of WMU FU-06, <br /> which was overlain by a HDPE geomembrane. The northern portion of WMU FU- <br /> 06 comprises a plan area of approximately 11.8 acres. <br /> 2.2 Project Construction Summary <br /> The construction of the northern portion of WMU FU-06 was conducted from early <br /> May, 2006, and substantially completed by August 2, 2006, and consisted of the <br /> construction of the leachate collection system and appurtenances. <br /> 2.3 Project Personnel <br /> The following personnel participated in the construction of the northern portion of <br /> WMU FU-06. <br /> PROJECT ROLE ORGANIZATION NAME <br /> Owner Forward Inc. Lochlin Caffey <br /> Reuben Ramirez <br /> Earthworks Contractor Guinn Construction Larry Simms <br /> Geosynthetics Contractor GSE Lining Ricky Sisombath <br /> Dale Geary <br /> Surveying Centerline Land Surveying, Kevin Nickolas, PLS <br /> Inc. Buck Buxton <br /> Ian Stanhope <br /> Design Engineer Lewis Engineering Sangeeta Lewis, PE <br /> CQA Project Vector Engineering,Inc. Monte Christie, PE, GE <br /> Manager/Certifying Engineer <br /> Lead CQA Monitor Vector Engineering, Inc. Mike Strobel <br /> Third Party Geosynthetics Lab Precision Geosynthetic Lab Cora Queja <br /> Vector Engineering,Inc.•143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.