Northern Portion of WMU FU-06 August 2006 <br /> Forward Landfill Project No.021605.07 <br /> 4.0 WMU FU-06 CONSTRUCTION <br /> As construction was implemented, Vector performed CQA monitoring. This section <br /> describes the CQA tasks associated with the construction of the earthworks and <br /> geosynthetic components of the northern portion of WMU FU-06. <br /> 4.1 Grading and Perimeter Berm <br /> Guinn graded the existing surface to achieve the design grades and constructed a <br /> perimeter berm around the northern portion of WMU FU-06. Grading was kept to a <br /> minimum to maintain the existing final cover. The soil material used for <br /> construction was obtained from an on-site borrow source and transported to the <br /> northern portion of WMU FU-06 by scrapers, placed, and compacted. The perimeter <br /> berm was constructed to the lines and grades shown on the construction drawings. <br /> Vector's CQA monitor observed that the material used to construct the berm did not <br /> have rocks or clods larger than 3 inches. Upon completion of the subgrade and <br /> perimeter berm construction, Guinn and Centerline Land Surveying, Inc. surveyed <br /> the as-built conditions. Centerline completed an as-built survey, including the <br /> perimeter berm and leachate collection trenches, and is included in Appendix G. <br /> 4.2 Perimeter Berm Geomembrane <br /> Following construction of the subgrade, a 60-mil smooth HDPE geomembrane was <br /> placed over the temporary perimeter berm. The HDPE geomembrane was supplied <br /> and installed by GSE of Houston, Texas. Vector's CQA Monitor observed the <br /> installation of the geomembrane. <br /> 4.2.1 Receiving Inspection <br /> Upon arrival by truck shipment, Vector's CQA monitor observed the unloading and <br /> storage of the geomembrane rolls. Each roll of geomembrane was logged in by roll <br /> number and then crosschecked against the quality control documents provided by <br /> the supplier. Following the inspection and approval of QC certifications, the <br /> Vector Engineering,Inc.•143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -6- <br />