Laserfiche WebLink
Northern Portion of WMU FU-06 August 2006 <br /> Forward Landfill Project No.021605.07 <br /> 5.0 CONCLUSION <br /> The completion of construction work requiring CQA observation occurred from mid <br /> June through July 2006. Based on our observations and testing during the <br /> construction of the northern portion of WMU FU-06 liner system at the Forward <br /> Landfill, it is Vector's professional judgment that the construction was completed in <br /> general accordance with the project plans and specifications, CQA plan, applicable <br /> regulations, and approved design modifications. <br /> Vector Engineering,Inc.• 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -17- <br />