Laserfiche WebLink
Northern Portion of WMU FU-06 August 2006 <br /> Forward.Landfill Project No.021605.07 <br /> over the geotextile. Vector's CQA Monitor observed placement of the materials to <br /> ensure that the placement activities did not damage the underlying geosynthetics. <br /> Upon completion of the protective soil layer, a survey was completed by Centerline <br /> Surveying. A copy of the as-built survey has been included in Appendix G. <br /> Vector Engineering,Inc.- 143E Spring Hill Drive-Grass Valley,CA 95945-(530)272-2448 <br /> -16- <br />