Laserfiche WebLink
FROM (FRO OCT 20 2006 11 :23/ST- 11 :20/NO. 6333050714 P 8 <br /> Project Name Eal-2-tvAlzD LA-NDFILL VAILU h <br /> r- .4 <br /> Inspector ',L's Name SV PENGINEERING <br /> Unit Tested Uimu - WEST <br /> Date o 0 <br /> ANNUAL LCRS GAS TEST TNSPECTJON <br /> (A) PRE-TEST INSPECTION <br /> 1. Are all potential conduits sealed properly? yes­L no <br /> 2. Do any potential conduits require repair? yes 110 <br /> 3 <br /> Tf any of the potential conduits required repair please list- NIA <br /> 4. Are any repairs needed to continue gas testing? yes no_ X <br /> S. Total number of potential conduits that require repair:21JA <br /> 6. [('repair,,,are required, complete a Maintenance Work Order(MWO). <br /> Comments: VaJl---2��Ag 441A&d 0" k)V- fo ot") <br /> (8) GAS INJECTION PHASE <br /> Tracer Gas Used: �&M h t C.XA c. Unit: bVA4 kjes+ <br /> I <br /> Start time of tracer gas injection: /7. 4-16 0--n Meter Start Reading: 5 S �+ � • <br /> Stop time or tracer gas iRiection: i?- 3:3 A Meter Stop Reading: 62S 9 <br /> Total volume of tracer gas iqicctcd(cubic feet) : 3q - 8 <br /> Average flow rate of injected tracer gas(cubic feet per min.): 0- 2-5- <br /> ,*t e <br /> Comments: Vq ccla,�, Ua,2 OWVL4 en.4 rrk,,�V- -(V 54L., 1, /" d;" <br /> ------------ <br /> Remedial Action Work Order Date Completed Signature <br /> Signature of Inspector ------ <br /> Page 1 of 2 <br />