Laserfiche WebLink
FROM (FRO OCT 20 2006 11 :23/ST, 11 :20/NO. 6333050714 P 9 <br /> Project Name -zy;L J, ft <br /> inspector's Name SUN► r4Suftj dVALUN <br /> ENGINEERING <br /> Unit Tested [Jm U -- Lze,61- <br /> Date —1_®-0-6 <br /> ANNUAL LCRS GAS TEST INSPECTION <br /> (C) GAS DETECTION MONITORING LOG <br /> Vacuum/blower start time: /J /0 Vacuum/blower flow reading: n� Y <br /> Docs the vacuum/blower reading indicate that the sump is blocked with water? Yes No-x <br /> Time Reading(ppm) Time Reading(prim) Time Readine tnpm) <br /> /4/o > 25vu <br /> Al2- 7 <br /> to ?ZS 6b 1430 2 2�� <br /> Iqqo 7 *2-C-To <br /> is-Do 2- <br /> ISI ® <br /> Was gas detected from the LCRS sump? Yes No If No, complete a MWO. <br /> Comments: <br /> Remedial Action Work Order Date Com leted Signature <br /> Signature of Inspector ` <br /> Page 2 of 2 <br />