My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 11:44:01 PM
Creation date
7/3/2020 10:52:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_7
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_7.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO.85_2003-0049 <br /> FORWARD INC. AND AI-LIED WASTE>NDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS Tl LANDFILL <br /> SAINT JOAQUIN COLTNTY <br /> e. closure of Austin Road Landfill Uztit 1 with an interi n.cover. <br /> 39. The groundwater extraction system consists of two ground water extraction wells with a <br /> combined design cap tcity of 305 gallons per rnin.u.te(gpm). VOCs are stripped from the <br /> extracted water and the treated water will be used to artificially recharge the shallow aquifer. <br /> LINER PERFORMANCE DEMONSTIWrION <br /> 40. On 15 September 2000 the Board adopted Resolution No. 5-00-21.3, "Request For The State <br /> Water Resources Control Board To Review The,Adequacy Of The Prescriptive Design <br /> Requirements For Landfill Waste Contaiuinent Systems To Meet The Performance Standards <br /> Of Title 27." The State.Board responded, in part, that"a single composite liner sce Stn <br /> continues to be an adequate mir..tilnum standard"however, the Board "should requite a more <br /> stringent design in a case where it determines that the minimum design will not provide <br /> adequate protection to a given body of groundwater." <br /> 41.In a letter dated 17 April 2001, the Executive Officer notified.Owners and Operators of Solid <br /> Waste Landfills that"tlic Board will require a demonstration that any proposed landfill liner <br /> system to be constructed after 1 January 2002 will comply with Title 27 performance <br /> standards. A thorough evaluation of site-specific factors and cost/benefit analysis of single, <br /> double and triple composite liners will likely be necessary. <br /> 42. On 21 February 2002, the Discharger submitted "Leachate Attenuation Analyses Preseri five <br /> Clay Liner, Forward Landfill", and on 21 .March staff provided comments for that document. <br /> On 10 July 2002 the discharger submitted "Performance Demonstration for a Single <br /> Composite Liner", and on 14 August 2002 staff provided comments for that document. On <br /> 25 September 2002 the discharger submitted a revised performance demonstration and on 24 <br /> October 2002 staff responded indicating concurrence with the revised demonstratiom The <br /> proposed liner system consists of a single composite base liner from bottom to top composed <br /> of: a prepared subgrade, two feet of compacted clay, 60 mil HDPE, one-foot gravel drainage <br /> layer, filter fabric, one-foot operations layer, and a first waste layer composed of selected <br /> waste. Sideslope liners to be composed of: a prepared subgrade, two-feet of compacted clay <br /> or GCL, 60 mil.HDPE, geocorctposite drainage net, and one-foot operations layer. Forward <br /> proposes to install a double co, liner under landfill sumps, conduct an electric leak test <br /> over the sump, conduct CQA inspections during placement of the operations layer and fust <br /> lilt of refuse, conduct all. electric leak test over the entire base liner after installation of the <br /> operations layer; and use selected material in the operations layer. The report demonstrated <br /> that the proposed liner system would effectively prevent the migration of wastes from the <br /> wmit, <br /> l l d 0 H09HH9 '0V99:£l 'i£/69 1 l 90H 0 i In (NON) Wpd� <br />
The URL can be used to link to this page
Your browser does not support the video tag.