My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 11:44:01 PM
Creation date
7/3/2020 10:52:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_7
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_7.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2003-0049 -10- <br /> FORWARD INC. AND ALLLED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS 11 LANDFILL <br /> SAN JOAQUIN COUNTY <br /> CONSTRUCTION AND ENGINEERED ALTERNATIVE <br /> 43. On 17 June 1993, the State Water Resources Control Board adopted Resolution No. 93-62 <br /> implementing a State Policy for the construction,monitoring, and operation of municipal <br /> solid waste landfills that is consistent with the federal municipal solid waste regulations <br /> promulgated under Title 40, Code of Federal Regulations,Tart 258 (Subtitle D). <br /> 44. Resolution No. 93-62 requires the construction of a specified composite liner system at new <br /> municipal solid waste landfills, or expansion areas of existing municipal solid waste landfills, <br /> that receive wastes after 9 October 1993. <br /> 45. Resolution No. 93-62 also allows the Board to consider the approval of engineered <br /> alternatives to the prescriptive standard. Section M.A.b. of Resolution No. 93-62 requires <br /> that the engineered alternative liner systems be of a composite design similar to the <br /> prescriptive standard. <br /> .46. Section 13360(x)(1) of the Cali forni.a Water Code allows the Board to specify the design, <br /> type of construction, and/or particular manner in which compliance must be met in waste <br /> discharge requirements or orders for the discharge of waste at solid waste disposal facilities. <br /> 47. The Discharger proposes a liner system which will be designed, constructed, and operated to <br /> prevent migration of wastes from the Unit to adjacent natural geologic materials, <br /> groundwater, or surface water during disposal operations, closure, and the post-closure <br /> maintenance period in accordance with the criteria set forth in Title 27 for a Class U landfill, <br /> and.the provisions in State Water Resources Control Board Resolution No. 93-62 for <br /> municipal solid wastes. <br /> 48. The Discharger submitted a Report of Waste Discharge and a Liner Performance <br /> Demonstration requesting approval of a single composite liner. <br /> 49. The single composite liner design proposed by the Discharger for the bottom liner of the Unit <br /> consists of., in ascending order: a prepared subgrade; a 24-inch thick, low-permeability soil <br /> layer(minimum permeability of I X 10-7 cm/sec);a 60-mil high density polyethylene <br /> (HDPE) geomembraue; a 12-ounce/square yard cushion geotextile (m.ay be omitted if the <br /> LCRS gravel is sub-angular to rounded); a 12-inch LCRS gravel drainage layer; an 8- <br /> outice/square yard separator geotextile; and a 12-inch thick protective cover soil operations <br /> layer. <br /> 50. The single compusite.li.ner design proposed by the Discharger for the side slope liner is to be <br /> constructed of, ill :ascending order: a prepared subgrade; a GCL or. a 24-inch thick low <br /> permeability soil layer (minimum per c.neability of the soil t X 10-7 cm/sec); a.geocompositc <br /> drainage net; and a 12-inch thick protective cover soil operations layer_ <br /> Z L d D 1 NH£S£9 'ON/99: S 1 '1S/00: b[ 9002 01 10 r (NON) WOdd <br />
The URL can be used to link to this page
Your browser does not support the video tag.