Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2003-0049 -10- <br /> FORWARD INC. AND ALLLED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS 11 LANDFILL <br /> SAN JOAQUIN COUNTY <br /> CONSTRUCTION AND ENGINEERED ALTERNATIVE <br /> 43. On 17 June 1993, the State Water Resources Control Board adopted Resolution No. 93-62 <br /> implementing a State Policy for the construction,monitoring, and operation of municipal <br /> solid waste landfills that is consistent with the federal municipal solid waste regulations <br /> promulgated under Title 40, Code of Federal Regulations,Tart 258 (Subtitle D). <br /> 44. Resolution No. 93-62 requires the construction of a specified composite liner system at new <br /> municipal solid waste landfills, or expansion areas of existing municipal solid waste landfills, <br /> that receive wastes after 9 October 1993. <br /> 45. Resolution No. 93-62 also allows the Board to consider the approval of engineered <br /> alternatives to the prescriptive standard. Section M.A.b. of Resolution No. 93-62 requires <br /> that the engineered alternative liner systems be of a composite design similar to the <br /> prescriptive standard. <br /> .46. Section 13360(x)(1) of the Cali forni.a Water Code allows the Board to specify the design, <br /> type of construction, and/or particular manner in which compliance must be met in waste <br /> discharge requirements or orders for the discharge of waste at solid waste disposal facilities. <br /> 47. The Discharger proposes a liner system which will be designed, constructed, and operated to <br /> prevent migration of wastes from the Unit to adjacent natural geologic materials, <br /> groundwater, or surface water during disposal operations, closure, and the post-closure <br /> maintenance period in accordance with the criteria set forth in Title 27 for a Class U landfill, <br /> and.the provisions in State Water Resources Control Board Resolution No. 93-62 for <br /> municipal solid wastes. <br /> 48. The Discharger submitted a Report of Waste Discharge and a Liner Performance <br /> Demonstration requesting approval of a single composite liner. <br /> 49. The single composite liner design proposed by the Discharger for the bottom liner of the Unit <br /> consists of., in ascending order: a prepared subgrade; a 24-inch thick, low-permeability soil <br /> layer(minimum permeability of I X 10-7 cm/sec);a 60-mil high density polyethylene <br /> (HDPE) geomembraue; a 12-ounce/square yard cushion geotextile (m.ay be omitted if the <br /> LCRS gravel is sub-angular to rounded); a 12-inch LCRS gravel drainage layer; an 8- <br /> outice/square yard separator geotextile; and a 12-inch thick protective cover soil operations <br /> layer. <br /> 50. The single compusite.li.ner design proposed by the Discharger for the side slope liner is to be <br /> constructed of, ill :ascending order: a prepared subgrade; a GCL or. a 24-inch thick low <br /> permeability soil layer (minimum per c.neability of the soil t X 10-7 cm/sec); a.geocompositc <br /> drainage net; and a 12-inch thick protective cover soil operations layer_ <br /> Z L d D 1 NH£S£9 'ON/99: S 1 '1S/00: b[ 9002 01 10 r (NON) WOdd <br />