My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 11:44:01 PM
Creation date
7/3/2020 10:52:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_7
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_7.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2003-0049 -18- <br /> FORWARD INC.AND ALLIED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS fl LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 5. Construction shall proceed only after all applicable construction quality assurance plans <br /> have been approved by Executive Officer. <br /> 6. Following the.completion of construction of a Unit or portion of a Unit, and prior to <br /> discharge onto the newly constructed liner system, the final documentation required in <br /> §20324(d)(1)(C) of Title 27 shall be submitted to the Executive Officer for review and <br /> approval. The report shall be certified by a registered civil engineer or a certified <br /> engineering geologgist: It shall contain sufficient information and test results to verify haat <br /> construction was in accordance with the design plans and specifications, and with the <br /> prescriptive standards and performance goals of Title 27. Testing shall include a liner <br /> leak detection test conducted after installation of the drainage layer and the operations <br /> layer. <br /> 7. A third party independent of both the Discharger and the construction contractor shall <br /> perform all of the construction quality assurance monitoring and testing during the <br /> construction of a liner system. <br /> 8. If monitoring reveals substantial or progressive increases of leachate generation above the <br /> design leachate flow volume by the Unit or portion of the Unit, such that the depth of <br /> fluid on any portion of the LCRS (excluding the leachate removal pump sump) exceeds <br /> 30 cm, the Discharger shall immediately notify the Board in writing within seven days. <br /> The notification shall include a timetable for remedial or corrective action necessary to <br /> achieve compliance with the leachate depth.limitation.. <br /> 9. Any WMU that will not receive waste over the winter rainy season (November 1 through <br /> March 30)shall be graded to shed stormwater(at least a 3% grade), maintained to prevent <br /> ponding and have an enhanced intermediate cover installed. The enhanced intermediate <br /> cover shall.consists of one foot of clayey soil.compacted to achieve a hydraulic <br /> conductivity of 10-5 cm/sec or some other equivalent hydraulic barrier overlain by an <br /> erosion layer composed of one foot of loosely compacted soil. <br /> 10. Closed landfill modules shall be graded to at least a three-percent(3%) grade and <br /> maintained to prevent ponding. <br /> E. D1ETFCTION MONITORING SPECIFICATIONS <br /> 1. The Discharger shall comply with the detection monitoring program provisions of Title <br /> 27 for groundwater, surface water, soil-pore gas, and the unsaturated zone, and in <br /> accordance with Monitoring and Reporting Program No. R5-2003-0049. <br /> 2. The Discharger shat I provide Board staff a minimum of one week notification prior to <br /> commencing any field activities related to the installation, repair, or abandonment of <br /> H d 0 H090£££9 '0N/99:£l 'iS/H: t 1900 O l WNW Wpad <br />
The URL can be used to link to this page
Your browser does not support the video tag.