Laserfiche WebLink
1 <br /> Summary of Northern California Youth Center Sampling Results for September 11,2007 <br /> Forward Landfill-Austin Road Unit,California Page 2 <br /> Future monthly sample results will be used to verify that all VOCs in the indoor faucet remain below <br /> ' their respective MCLs. <br /> Forward Landfill and the NCYC continue to pursue extending municipal water to the NCYC facility. <br /> ' Forward Landfill is currently in the design phase of the water line project. Forward Landfill personnel <br /> indicate that upon completion of a field investigation, a deliverable package will be submitted to the <br /> City of Stockton for permitting and the contractor bidding will begin. The project is anticipated to be <br /> ' complete by the end of 2007. <br /> Sincerely, <br /> ' Herst&Associates,Inc. <br /> Ward Herst,PG,HG David Vasbinder <br /> Managing Director Staff Geologist <br /> ' California PG#7150 <br /> California HG#775 <br /> ' Cc: Ross Atkinson—RWQCB <br /> Robert McClellon—San Joaquin County LEA <br /> Reuben Ramirez—Forward Landfill <br /> ' Lochlin Caffey—Forward Landfill <br /> Attachment—Laboratory Analytical Results <br /> 1 <br />