Conditions for N-338-17-t0 (continued) Page 3 c(9
<br /> 24. The facility shalt install and maintain in proper operating ooudition a gas flow meter with a continuous recording
<br /> device which measures the amount of landfill gas cottsumsd in the flares and the amount of landfill gas controlled by
<br /> the CA$per day,each.jDistrict NSR Rule)Federally 1?nforcooble Through Title V Permit
<br /> 25. The flares shall b equippcd with a temperature indicator and recorder that measures and records the operating
<br /> temperature. The temperature indicator and recorder must operate continuously.[District NSR Rulej Federally
<br /> F.oforceable Through Title V Permit
<br /> 26. The enclosod nares shall be equipped with automatio dampers,an automatic shutdown device,and a flame arresict.
<br /> [District NSR Rule]Federally Enforceable Through Title V Permit
<br /> 27. The enclosed flares shall be equipped with an LPG or.natural gas tired pilot.(District NSR Rule)Federally
<br /> Enforceable Through Title V Permit
<br /> U. Source testing on the nares shall be parformed to demonstrate compliance with the NOx and CQ limits,and the VOC
<br /> destruction efficiency of 98%or 20 ppmv @ 3%oxygen(as hexane)as required by this permit shall be conducted
<br /> annually.(District N$K Rule)Federally Enforccablt Through Title V Permit i
<br /> 29, Source testing for NUx shall be conducted using CARB Method 7 or Method 20.[District Rule 108 t]I;ederaily
<br /> Enfomeable'flrough Title V Pennit
<br /> 30.. Source testing for CO shall be conducted usi»g EPA Method 10 gr leis,CARB Methods I Brough 5 with 10,or
<br /> CARS Method 100.(District Role 108 11 Federally EzttdrecmbkiTiirough Title V Permit
<br /> 31. VOC emissions stall be measured by EPA Method 18,25,25A,or 25C.[District Rule IOS I]Federally Enforceable y
<br /> Through Title V Permit
<br /> 32. H2S concentration of the holuent landfill gas to the threw shall not exceed 46.9 ppmv,(District NSR Rule)Federally
<br /> Enforceable Through Title V Fetmit.
<br /> 33. Gas combustod in the flares shall be tested Por RLS mntent.on a quarterly basis using draeger tubes. if conmpl iance is
<br /> shown for two consecutive !
<br /> quarters,the ttstingfreyuerarymay he changed W annual, Quarterly testing shalt resume if
<br /> any annual test shoat nmmampliauce.[District Rule 10811 Federally'Wbrocable Through Title V Pemtit
<br /> 34. Upon receiving an approved plan for cloture,or partial closure,the operator shall modify this operating permit to
<br /> comply with the requiventents of District Rule 4642.(District Rule 4642,32 and 4.1.11 Federally F.nforowbie Through
<br /> Title V Permit
<br /> 35. Ceras collection system shall be.operated in a manner which maximizes the amount of laudfiih.gas extracted while
<br /> prcventiag overdraw that can cause fres or damage the gas collation system.[Dlsttict NSR Rule)Federally
<br /> linforceablo Through Title V Pennii
<br /> i
<br /> 36. During maintenance of the gas coiicciimt system or incincratfmr device,emissions of landfill gas shall bo minimized
<br /> during shutdown.[District NSR Rule]Federally L iforocable Through Title V Permit
<br /> 31. Maintenance Is def red as Work performed on a gas collection system andror control device m order to ensure
<br /> continued compliance with District rales,regulations,an"r Permits to Operate,and to prevent its failure or
<br /> malfunction, (District NSR Rulaj Federally Enforceable Though Title V Permit
<br /> 38.. The pennitt"shall notify the APCO by talephone at hast 24 hours before performing any maintenance wurk than
<br /> requires the system to be shutdown, 'fhe notification shall include a description of work,lie date work will be
<br /> perlbr med and the amount of time needed to complete the maintenance work,[District NSR Rule]Federally
<br /> Fatforeoable'Throogh Title V Permit i
<br /> 39. Permittee atoll maintain rocords of system inspections including:date,time and inspection results,[District Rule 10701 i
<br /> j Federally.EnfcroeabloThroughTitle V Permit
<br /> 4
<br /> 40. Pocmittee shall maintain records of maintomamoo related or other collection system cud central device downtime,
<br /> including individual weir shutdown.(District Rote 1070)Federally Enforceable Through Title V Petmft a
<br /> 41. The operator shall record emission control device source tests emissions of CO,NOx,and VOC)in pounds pear
<br /> Mhtbtu heat input.Operator shall also record VOC desuuctionfuo aunent etliehency.[District Rule 1081 J Federally
<br /> Enforceable Through Title V Permit
<br /> CONDITIONS CONTfN0E�414 N.F.JCr PAGE
<br /> 4.............uwrr.�sw,ao-e•....-..,..-r...r.--....,.v,,.<....,..,.. � � i
<br /> i
<br /> the laudfilI that warrants control over theintendeduse period of the gas control or treatment systems equipment,call= j
<br /> has from each area,cell,or group ofccus in the landfill in which the initial solid waste has been placed for a period of
<br /> 5 years or more if active;or 2 years or more ifelosod or at final grade,collect gas at a sufficient attraction rate,and be
<br /> designed to minimize off-silo migration of subsurlhce gas.[40 LTR 60.752(b)(2)(il)(A)]Federally Enforceable i
<br /> Ttrrough Title V Permit
<br /> 49. All collected gas shall bo routed to a control system designed and operated to reduce]!to N]v10C by 98 weight percent
<br /> or reduce the outlet NMOC:concentration to less than 20 pans per million by volume,dty basis as hexane at 3 percent
<br /> oxygen. The reduction efticierwy shall be established by an initial performance test to boo cmnpl.cted no later than 180 j
<br /> days after the initial startup of the approved Control system using the tort methods speei&ed in Section 60.7$4(4)•(40
<br /> CFR 60,752(b)(2)(iti)(S))FedamilyEnforceable Tli ough Title V Permit
<br /> 50. Pennisee shall operate the collection system so that the nunhane concentration Is.less than 500 parts per million above
<br /> background at tike surface of the landfill.To determine if this level is exceeded.the owner or operator shall conduct
<br /> surface testing around the perimeter of tie collection area and along a pattern that traverses the landfill at 30 meter
<br /> intorvats and where visual observations irxGcatc elevated cormtcnrations mf landfill gas,such as distressed vegatarion
<br /> and Cracks or steps in the cover.The owner.or operator tray establish an alternative traversing pattern that ensures
<br /> equivalent coverage. A surface monitoring design plan sdal)be developed that includes;a topographical map with the,
<br /> monitoring route and the rationale for any sito•specifrc deviations from the 30 materintexvals.Areas with steep s)opos
<br /> or other dangerous areas may be excluded from the surface testing.(40 CFR 60.7530)federally Enforceable
<br /> Through Title V permit
<br /> 51. Compliance with this st rfaix urethane operational staadatd shall be demonstrated using the procedures outlined in 40
<br /> CPR 60.755(c)within 180 days of installation and Aamttp of the collection and control system and quarterly thpufter.
<br /> [40 CFR 60.753(d),40 CER 60.755(c),and 40 CFR 60.8)Federally Gnforocable Mono&Title V Permit
<br /> 52. Permittee shall operate the unclosed flare at all times when the colleclod gas is routed to it.[40 CFR 60.753(111
<br /> Federally Enfonxablc ThroughTitle V Permit
<br />
|