Conditions for N-339-17-10 (continued) Page 5 of 9 <br /> 54. Permittee shall operate the landfill gas collection system with negative pressure at each wellhead except under the <br /> following conditions:(1)A fire or increased well temperature. The owner or operator shall record instances when <br /> positive pressure occurs in efforts to avoid a fire. These records shall be submitted with the annual reports ass <br /> provided in 60.757(f)(1);(2)Usc of a geomembranc or synthetic cover. The owner or operator shall develop <br /> acceptable pressure limits in the design plan;(3)A decommissioned well. A well may experience a static positive <br /> pressure after shut down to accommodate for declining flows. All design changes shall be approved by the APCO.140 <br /> CFR 60.753(b))Federally EnfoTceable Through Title V Permit <br /> 55. Permittee shall operate each interior wellhead in the collection system with a landfill gas temperature less than 55 C t <br /> and with either a nitrogen level less than 20 percent or an oxygen level less than 5 percent. The owner or operator may t I <br /> establish a higher operating temperature,nitrogen,or oxygen value at a particular well. A higher operating value j <br /> demonstration shalt show supporting data that the elevated parameter does not cause fires or significantly irthibit <br /> anaerobic decompositions by killing methanogens.[40 CFR 60.753(c)]Federally Enforceable Through Title V Permit i <br /> 56. The collection system shall be operated so that the methane concentration is less than 500 parts per million above <br /> background at the surface of the landfill,and such that all collected gases are vented to a control system designed and <br /> operated in compliance with§60.752(b)(2)(iii).In the event the collection or control system is inoperable,the gas <br /> mover system shall be shut down and all valves iri the collection and control system contributing to venting of the gas <br /> to the atmosphere shall be closed within I hour.[40 CFR 60.753(d),(e))Federally Enforceable Through Title V i <br /> Permit I <br /> 57. If monitoring demonstrates that the operational requirements in'paragraphs(b),(c),or(d)of section 60.753 are.not <br /> inet,corrective action shall be taken as specified in 40 CFR 60.755(a)(3-5)or(c). If corrective actions are taken as <br /> specified in 60.755,the monitored exceedance is not a violation of the operational requirements in this section.[40 <br /> CFR 60.753(8)) Federally Enforceable Through Title V Permit <br /> 58_ For each interior wellhead,the nitrogen level shall be determined.using Method 3C,unless an alternative test method is <br /> established as allowed by 60.752(b)(2)(i)of this subpart.[40 CFR 60.753(c)(1)] Federally Enforceable Through Title 1 <br /> V Permit- <br /> 59. For each interior wellhead,unless yin alternative test method is established as allowed by 60.752(b)(2)(i)of this <br /> subpart,the oxygen shall be determined by an oxygen meter using Method 3A or 3C except that:(i)The span shall be j <br /> set so that the regulatory limit is between 20 and 50 percent of the span;(ii)A data recorder is not required;(iii)Only <br /> two calibration gases are required,a zero and span,and ambient air may be used as the span;(iv)A calibration error <br /> check is not required;(v)The allowable sample bias,zero drift,and calibration drift are f10 percent.[40 CFR - <br /> 60.-753(e)(2)]Federally Enforceable Through Title V Permit I <br /> 60, Permittee shall calculate the NMOC emission rate for purposes of determining when the collection and control system <br /> can be removed as provided in 40 CFR 60.752(b)(2)(v)by using the equation found in 40 CFR 60.754(b).(40 CFR <br /> 60.754(b))Federally Enforceable Through Title V Permit <br /> 61. For the performance test required in 60.752(b)(2)(iii)(B),Method 25,25C,or Method 18 of Appendix A must be used <br /> to determine compliance with the 98 weight percent efficiency or the 20 ppmv outlet concentration level,.unless <br /> another method to demonstrate compliance has been approved by the APCO as provided by 60.752(b)(2)(i)(13). <br /> Method 3 or 3A shall be used to determine oxygen for correcting the NMQC concentration as hexane to 3 percent. In <br /> cases.where the outlet concentration is less than 50 ppm NMOC as carbon(8 ppm NMOL as hexane),Method 25A <br /> should be used in place of Method 25. If using Method 18 of appendix A,the minimum list of compounds to be tested <br /> shall be those published in the most recent Compilation;of Air Pollutant Emission Factors(AP-42). The following <br /> equation shall be used to calculate efficiency:(NMOCin-NMOCout)/N1v1OCin. The District must be notified at least <br /> 30 days prior to any compliance source test,and a source test plan must be submitted for approval at least 15 days <br /> prior to testing. [District Rule 1081;40 CFR 60.754(d))Federally linforceable Through Title V Permit <br /> 62: For the purposes of calculating tiie maximum expected gas generation flow rate from the Iandfill to determine <br /> compliance with 60.752(b)(2)(ii)(A)(I),one of the equations in Section 60.755(a)(1)(i)or(ii)or(iii)shalt be used.[40 <br /> CFR 60.755(x)(1))Federally Enforceable Through Title V Permit <br /> 63. For the purposes of determining sufficient density of gas collectors for compliance with 60.752(b)(2)(ii)(A)(2),the <br /> owner or operator shall design a system or vertical wells,horizontal collectors,or other collection devices,satisfactory <br /> to the APCO,capable ofcontrolling and extracting gas Brom all portions ofthe landfill sufficient to meet all <br /> operational and performance standards.[40 CFR 60.755(a)(2)]Federally Enforceable Through Title V Permit <br /> CONDITIONS CONTINUE ON NEXT PAGE <br /> . N•33C17•IO:MgNt00.SoSPN-LET <br /> e. .wxw-x....a...w.........www.......r�..u� w....,... ...w>...n.. .. ..«....w,, r..awar....>..a... ...v..........c.+....r•.,r f s...-...v.....n•ro•....a.on.-..vx....w ... ...w, +. a. ..;..:r+.,..�-..r., <br />