My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:53:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_23.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Conditions for N-339-17-10 (continued) Page 7 of.9 <br /> 75. The enclosed flare shall be equipped with either a device that records flow to the control device. The owner or <br /> operator shall install,calibrate,and maintain a gas flow rate measuring device that shall record the now to the control <br /> device at least every IS minutes. [40 CFR 60.756(b)(2)]Federally Enforceable Through Title V Pcnnil <br /> 76. Operator shall measure the gauge pressure in the gas collection header on a monthly basis as provided in§ <br /> 60.755(a)(3);and monitor nitrogen or oxygen concentration in the landfill gas on a monthly basis as provided in§ } <br /> 60.755(x)(5);and monitor temperature of the landfill gas on a monthly basis as provided in§60.755(a)(5).[40 CFR ' <br /> 60.756(x)]Federally Enforceable Through Title V Pennit <br /> 77. Any elosed landfill that has no monitored exceedances of'the operational standard in three consecutive quarterly <br /> monitoring periods may skip to annual monitoring. Any methane reading of 500 ppm or more above background <br /> detected during the annual monitoring returns the frequency for that landfill to quarterly monitoring.[40 CFR <br /> 60.756(f)]Federally Enforceable Through'Title V Permit <br /> 78. Each owner or operator shall keep for at least 5 years up-to-date,readily accessible,on-site records of the maximum <br /> design capacity,the current amount of solid waste in-place,and the year-by-year waste acceptance rate. Off-site <br /> records may be maintained if they are retrievable within 4 hours.[40 CFR 60.758(a)and District Rule 2520,9.4.2] <br /> Federally Enforceable'Through Title V Permit <br /> 79. The initial annual report shall be submitted within 180 days of installation and start-up of the collection and control <br /> system,and shall include the initial performance test report required under 40 CFR 60.8.The initial report shall <br /> include information specified in 40 CFR 60.757(g)(I-6). [40 CFR 60.757(1),(g)]rederally Enforceable Through Title <br /> W Permit <br /> 80. The following constitute exceedances that shall be recorded and reported under 40 CFR 60.757(1):all 3-hour periods <br /> of,operation during which the average combustion temperature was more than 28°C below the average combustion <br /> s:. o <br /> temperature during the most recent performance test(flare source test).[40 CFR 60.758(c)]Federally Enforceable <br /> Through Title V Permit <br /> 81. .Except as provided in 60.752(b)(2)(i)(B),each owner or operator of a controlled landfill shall keep up-to-date,readily <br /> accessible records for the life of the control equipment of the data listed in paragraphs 60.758(b)(1)tlunugh(b (4 as <br /> measured during the initial perfemiance test or compliance determination. Records of subsequent tests or monitoring <br /> shall be maintained for a minimum of 5 years. Records of the control device vendor specifications shall be maintained <br /> until removal.[40 CFR 60:758(6)]Fcdcrally Enforceable Through Title V Permit <br /> 82. Permittee shall keep the following records:(1)(i)the maximum expected gas generation flow rate as calculated in <br /> 60.755(a)(1). The owner or operator may use another method to determine the maximum gas generation flow rate,if <br /> the method has been approved by the APCO;(ii)the density of wells,horizontal collectors,surface collectors,or other <br /> gas extraction devices determined using the procedures specified in 60.759(a)(1);(2)(i)the average combustion <br /> temperature measured at feast every I S minutes and averaged over the same bine period of the perfonnance test;(ii) <br /> the percent reduction of NMOL determined as specified'in 60.752(b)(2)(ii)(B)achieved by the control device,[40 <br /> CPR 60.758(b)(1)and(2)]Federally Enforceable Through Title V Permit <br /> 83,' Permittee shall keep up-to-date,readily,accessible continuous records of the indication of flow to the enclosed flare. <br /> [40 CFR 60.758(c)]Federally Enforceable Through Title V Permit <br /> 84. Except as provided in 60.752(b)(2)(i)(B),permittee shalt keep,for the life of the collection system,an up-to-date, <br /> readily accessible plot map showing each existing and planned collector in the system and providing a unique <br /> identification location label for each collector. Petmittee shall keep readily accessible documentation of the nature, <br /> date of deposition,amount,and location of asbestos-containing or nondegradable waste excluded from collection as <br /> well as any nonproductive areas excluded froth collection.[40 CFR 60.758(d)]Federally Enforceable Through Title V <br /> Permit i•. <br /> 85. Except as provided in 60.752(b)(2)(i)(B),permittee shall keep for at least 5 years up-to-date,readily accessible record <br /> of all collection and control system excecdances of the operational standards in 60.753,the reading in the subsequent <br /> Month whether or not the second reading is an exceedance,and the location of each exceedance.[40 CFR 60.758(e)] <br /> Federally Enforceable Through Title V Permit <br /> CONDITIONS CONTINUE ON NEXT PAGE <br /> +uaapno:wrszoor e�rM...er <br />
The URL can be used to link to this page
Your browser does not support the video tag.