Laserfiche WebLink
Conditions for N-339-17-10 (continued) Page 6 of 9 <br /> 64, For the purpose of demonstrating whether the gas collection system flow rate is sufficient to dctermilie compliance {k <br /> with 60.752(b)(2)(ii)(A)(3),the owner or operator shall measure gauge pressure in the gas collection header at each f; <br /> individual well,monthly, If a positive pressure exists,action shall be initiated to correct the exceedance within 5 '. <br /> calendar days,except for the three conditions allowed under 60.753(b). If negative pressure cannot be achieved <br /> without excess air infiltration within 15 calendar days of the first measurement,the gas collection system shall be is <br /> expanded to correct the exceedance within 120 days of the initial measurement ol'positive pressure. Any attempted <br /> corrective measure shall not cause exceedances of other operational or performance standards. An alternative timeline <br /> for correcting the exceedance may be submitted to the APCO for approval.[40 CFR 60.755(a)(3)]Federally <br /> Enforceable Through Title V Permit <br /> 65. Owners or operators are not required to expand the system as required in paragraph 60.755(a)(3)during the first 180 <br /> days after gas collection system startup,[40 CFR 60.755(a)(4)]Federally Enforceable Through Title V Permit <br /> 66. For the purpose of identifying whether excess air infiltration into the landfill is occurring,the owner or operator shalt <br /> monitor each well monthly for temperature and nitrogen or oxygen as provided in 60.753(c). If a well exceeds one of <br /> these operating parameters,action shall be initiated to correct the exceedance within 5 calendar days. If correction of <br /> the exceedance carnnot be achieved within 15 calendar days of the first measurement,the gas collection system shall be <br /> expanded to correct the excee-dance within 120 days of the initial exceedance. Any attempted corrective measure shall <br /> not cause exceedance of other operational or performance standards. An alternative timeline for corrected in the <br /> exceedance may be submitted to the APCO for approval.[40 CFR 60.755(a)(5)]Federally Enforceable Through Title <br /> V Pertnit <br /> 67, .The provisions of this subpart apply at all times,except during periods of start-up,shutdown,or malfunction,provided <br /> that the duration of start-up,shutdown,or malfunction shall not exceed 5 days for collection systems and shall not <br /> exceed I hour for treatment or control devices.[40 CFR 60.755(e)]Federally Enforceable Through Title V Permit <br /> 68. 'Surface testing shall"be performed on a quarterly basis using an.organic vapor analyzer,flame ionization detector,or <br /> other portable monitor ineeting the specifications provided in 40.CFR 60.755(d).[40 CFR 60.755(exl)]Federally <br /> 'Enforceable Through Title V Permit <br /> 69. The background concentration shall be determined by moving the probe inlet upwind and downwind outside the <br /> boundary of the landrll at a distaticc of at least 30.meteis.from,the perimeter wells.[40 CFR 60.755(c)(2)]Federally <br /> Enforceable Through Title V Permit <br /> .70. Surface emission monitoring shall be performed in accordance with section 4.3.I of Method 21 of appendix A,except <br /> that the probe inlet shall be placed within 5-to 10 centimeters of the ground. Monitoring shall be performed during. <br /> typical meteorological conditions. Any reading of 500 parts per million or more above backgrouud at any location <br /> shalll be recorded as a monitored exceedanee and the actions specified in 40 CFR 60.755(c)(4)(i-v)shall be taken. As <br /> long as the specified actions are taken,the exceedance is not a violation of tile operational requirements of 60.753(d). <br /> [40 CFR 60.755(c)(3),(4)]Federally Enforceable Through Title V Permit <br /> 7:i.. Permittee shall implement a program to monitor for cover integrity and implement cover repairs as necessary on a <br /> monthly basis,[40 GFR 60.755(c)(5)]Federally Enforceable Through Title V Permit <br /> 72, The portable analyzer shall meet the instrument specifications of Method 21,section 3(except that"methane"shall <br /> rep.laee all references to VOC).The calibration gas shall be methane,diluted to a nominal concentration of 500 parts <br /> per million in air.To meet the performance evaluation requirements of Method 2I,section 3.1.3,the instrument <br /> evaluation procedures of Method 21,section 4.4 shall be used.Tile calibration procedures provided in Method 21, <br /> section 4.2 shall be followed immediately before commencing a surface monitoring survey. The provisions of this <br /> condition apply at all times,except during periods of start-tip,shutdown,or malfunction which shall not exceed 5 days <br /> for collections systems and shall not exceed 1 hour for treatment or control devices.[4Q CFR 60a755(d),(e)]Federally <br /> Enforceable Through Title V Permit <br /> 73. Each wellhead shall have a sampling port acid a thermometer,other temperature-measuring device,or an access port <br /> for temperature measurements,[40 CFR 60.756(a)]Federally Enforceable Through Title V Permit <br /> 74. The enclosed flare shall be equipped with a temperature monitoring device equipped with a continuous recorder and <br /> having a minimurn accuracy of 1-1.percent of the temperature being measured expressed in degrees Celsius or A:0.5 <br /> degrees Celsius,whichever is greater.[District NSR Rule,40 CFR 60:756(b)(1)]Federally Enforceable Through Title <br /> V Permit <br /> CONDITIONS CONUNUE ON NEX3'PAGE <br /> "N43"I.n:Mn 14 NO?5.05 1-[EI . <br /> — ..µ-:...tir,.,a V v ...>.......w..,r.. e.....>..ra,v.r..,�<.v M... -....,r >..........n...nw+:...ra .,.. +• ...a..+ .vn rn... r_'.Y..aa .. .. -....r .a .... .1.. .... ..:r y' ._ <br />