Laserfiche WebLink
........... <br /> ..._..._._.._ .._. <br /> f <br /> Conditions for til-339-17-10 (continued) Page 9 of 9 <br /> 93. Each owner or operator seeking to comply with 60.752(b)(2)(i)(A)shall construct the gas collection devices using the <br /> following equipment or procedures:(1)"Me landfill gas extraction components shall be constructed of polyvinyl <br /> chloride(PVC),high density polyethylene(HDPE)pipe,fiberglass,stainless steel,or other nonporous corrosion <br /> resistant material of suitable dimensions to:convey projected amounts of gases;withstand installation,static,and <br /> settlement forces;and withstand.planned overburden or traffic loads. The collection system shalt extend as necessary <br /> .to comply with emission and migration standards..Collection devices such as wells and horizontal collectors shall be <br /> perforated to allow gas entry without head loss sufficient to impair performance across the intended extent ofcontrol. <br /> Perforations shall be situated with regard to the need to prevent excessive air infiltration;(2)Vertical wells shall be ( ' <br /> s <br /> placed so as not to endanger underlying liners and shall address the occurrence of water within the landfill. Holes and t <br /> trenches constructed for piped wells and horizontal collectors shall be of sufficient cross-section so as to allow,for their ! <br /> proper construction and completion including,for example,centering of pipes and placement of gravel backfill j <br /> Collection devices shall be designed so as not to allow indirect short circuiting of air into the cover or refuse into the f <br /> collection system or gas into lite air. Any gravel used around pipe perforations should be of a dimension so as not to <br /> penetrate or block perforations;(3)Collection devices may be connected to the collection header pipes below or above <br /> the landfill surface. The connector assembly shall include a positive closing throttle valve,any necessary seals and <br /> couplings,access couplings and at least one sampling port. The collection devices shall be constructed of PVC, <br /> HDPE, fiberglass,stainless steel,or other nonporous material of suitable thickness.(40 CFR 60.759(b))Federally <br /> Enforceable Through Title V Permit { <br /> 94. Each owner or operator seeking to comply with 60.752(b){2)(i)(A)shall convey the landfill gas to a control system in . <br /> compliance with 60.752(b)(2)(iii)through the collection header pipe(s). The gas mover equipment shall be sized to l <br /> handle the maximum gas generation flow rate.expected over the intended use period of the gas.mD-Or(g equipment <br /> using the following procedures:(1)For existing collection systems,the flow data shall be used to project the maximum <br /> flow rate. If no flow data exists,the procedures in pamgrapb.60.759(c)(2)shall be used;(2)For new collection <br /> systems,the maximum flow rate shall be in accordance;with 60.755(a)(1).[40 CPR 60.759(c)]Federally Enforceable <br /> Through Title V Permit <br /> i <br /> I <br /> N•J70.11.10,Nay tt]pp,4'of Alf-LfT <br /> .. w4'M�'.w.w••w..-•+•Mrtx.rc r.e..m. J ..r. rnm.--.v...r.-ss. ..i:.....✓w...... xn«. :..w..._..a.. a i.a .w r..ri.-... .. tun•.•rn•r«..».a_....-...a acs.: �.n ..w-t...._....... .,i. ns.nw. i <br />