My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_23
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:53:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_23.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Robert McClellon <br /> Gas Extraction Well Permit for Forward Landfill <br /> August 6,2008 <br /> Page 2 of 2 <br /> 2. Provide calculations regarding capacity of system to handle the addition of the <br /> extraction wells. <br /> In 2007, the flare station was expanded to handle future addition/gas flow from the <br /> landfill. Flare#1 has 2,000 SCFM of capacity and Flare#2 has 3,500 SCFM of capacity. <br /> The flare station is currently only processing approximately 1,410 SCFM of landfill gas. <br /> Thus, the flare station has the capability to process much more landfill gas as the site <br /> continues to expand. <br /> The site has approximately 243 vertical gas extraction installed in waste, 46 soil vapor <br /> extraction wells, and several horizontal gas collectors. Thus, on average, each well is <br /> producing between 5 and 6 SCFM of landfill gas. The impact these additional wells will <br /> have on overall system is minimal. <br /> 1 <br /> 3. Provide copy of Authority to construct from APCD. <br /> A copy of the Authority to Construct from APCD is attached for your review, <br /> i <br /> i <br /> 1 <br /> , <br /> BRYAN A.SiTIRRAT&ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.