Laserfiche WebLink
3.14 CLOSURE IMPLEMENTATION SCHEDULE <br /> As discussed in Section 1.5, the Forward Landfill is expected to reach capacity in <br /> the year 2020. As required by 27 CCR, Section 21780 (c)(2), a FCPCMP will be <br /> submitted for approval two years prior to the anticipated date of closure. In <br /> accordance with 27 CCR, Section 21110, closure activities will then commence <br /> within 30 days following the last receipt of waste and will conclude within 180 <br /> days following the beginning of closure, or in accordance with an alternate <br /> schedule approved by the LEA and the CIWMB and included in the FCPCMP. <br /> Closure construction will begin with mobilization of equipment and materials. <br /> The type of equipment and required personnel expected to be utilized during <br /> closure construction includes but is not limited to, the following: <br /> • Equipment <br /> - Scrapers <br /> - Dozers <br /> - Loaders <br /> - Compactors <br /> Trucks <br /> - Soil Screening Equipment <br /> - Motor Grader <br /> - Water Truck <br /> • Personnel <br /> - Construction Manager <br /> - Field Inspector(s) <br /> - Engineer(s) <br /> - Geotechnical Engineer/Geologist <br /> - Geotechnical Technician(s) <br /> - Labor Crews <br /> - Equipment Operators <br /> - Surveyors <br /> - Mechanics <br /> 0 <br /> Forward Landfill PCPCMP 3-16 <br /> L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec3:8/20/01 BRYAN A.STIRRAT&,ASSOCIATE <br />