Laserfiche WebLink
® materials. These costs are projected in 2008 dollars, assuming no change in <br /> the regulatory environment with respect to the Forward Landfill. <br /> It should be noted that the maintenance and monitoring costs presented have <br /> been projected utilizing current regulations and applicable requirements. In <br /> the event that changes occur in the regulatory conditions pertaining to the <br /> Forward Landfill, these estimates will be adjusted accordingly, if necessary, <br /> and submitted to the CIWMB, EA and RWQCB. <br /> 5.4 DEMONSTRATION OF FINANCIAL RESPONSIBILITY <br /> Closure/Post-Closure/Corrective Action Program (CAP) Maintenance Fund <br /> In accordance with 27 CCR, Chapter 6 and 40 CFR, Part 258, Subpart G, an <br /> operator must demonstrate financial assurance for the closure, post-closure <br /> maintenance, and groundwater corrective action for reasonably foreseeable <br /> releases at a landfill. The financial assurance mechanism in the form of a <br /> Certificate of Insurance is in place for the Forward Landfill (see documentation <br /> included in Appendix ). <br /> • <br /> Forward Landfill PCPCMP 5-2 <br /> Z:\PROJECTSWIIied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Section 5.doc <br /> Amend.No.4:8/7/08 <br />