Laserfiche WebLink
t. <br />Attachment 4 <br />Forward Landfill -187.6-Acre Closure Area <br />Gas Control System Modifications Cost Estimate <br />Item <br />No. I Description <br />2aivage anore Install well manifold <br />Salva a and nstall wellhead assembly <br />2"SCH 80 PVC well lateral &fittings in trench/slee, <br />2"SDR 9 HDPE compressed air in common trench <br />Salvage and re -install 2" HDPE compressed air/cor <br />2"SDR 11 HDPE condensate line in common trenc <br />PHDPE <br />HDPE, single pi in trench <br />HDPE, multiple lines in common trench <br />ind Flange <br />ectro-fuinexisting 2" HDPE air or Mnexisting 4" HDPE well lateral (PVC) <br />Cut & Cap existing 18" HDPE header (PVC) <br />Install 18" x 8" HDPE saddle (for temporary jumper) <br />2 PVC MIp Adapter Into existing HDPE or PVC hea <br />Salvage and re -install 18" x 6" PVC SaddlefreeoQ n <br />Salvage and re -install 18" x 6" HDPE Saddle/Tee G <br />Salvage and re -install 18" PVC Elbow <br />Salvage and re -Install 18" HDPE Flange Adapter & t <br />Salvage and re -install 18" PVC Flange & Hardware <br />18" SDR 17 HDPE pipe in trench (as required) <br />Salvage and re -install 18" SDR 17 HDPE in trench <br />Salvage and re -install 18" x 14" HDPE Eccentic Red1 <br />Salvage and re -Install 18" SCH 40 PVC Header on p <br />Salvage and re -install double pipe support <br />nstall double pipe support <br />18" PVC SChd40 Pipe on Supports <br />ialvage and re -install 14" ITC Flex Hose and clamps <br />Salvage and re -install 18" x 14" Eccentric PVC Redu1 <br />Salvage and re -install 18" Butterfly Valve <br />'alvage and re -install Condensate Pump Station <br />salvage and re -Install 18" x 4" HDPE Tee (at sump) <br />'alvage Covanta Energy piping on grade <br />le -install Covanta Energy piping on grade <br />,ut & Cap Covanta Energy Vertical Gas Extraction W <br />xtend Covanta Energy Vertical Gas Extraction Well <br />nit <br />EA <br />Unit Costs <br />Total <br />$28,765 <br />21 EA $ <br />39 Single Pipe Support <br />1,581.25 <br />Cost <br />EA <br />$ <br />-EA <br />41 6" CSP Sleeve Road Crossing 83 EA $ <br />$ <br />2,248.25 <br />$84,354 <br />12 00 <br />12.00 <br />A <br />$ <br />*F$ <br />189.18 <br />$5,521 <br />339 <br />$1,339 <br />LF <br />$ <br />7.22 <br />$26,487 <br />F <br />$ <br />2.81 <br />$17,572 <br />4 EA $ <br />46 14" PVC Elbow <br />F <br />$ <br />1.55 <br />$56,864 <br />483.13 <br />F <br />$ <br />2.07 <br />$12,944 <br />$195,904 <br />F <br />$ <br />13.89 <br />$1,737 <br />4,169 <br />LF <br />$ <br />8.33 <br />$34,727 <br />4 <br />EA <br />$ <br />715.92 <br />$2,985 <br />334 <br />EA <br />$ <br />77.62 <br />$25,887 <br />75 <br />EA <br />$ <br />69.00 <br />$5,178 <br />334 <br />EA <br />$ <br />66.12 <br />$22,052 <br />33 <br />EA <br />$ <br />399-651 <br />$13,329 <br />29 <br />EA <br />$ <br />617.84 <br />$18,030 <br />29 <br />EA <br />$ <br />35.50 <br />$1,036 <br />21 <br />EA <br />$ <br />569.08 <br />$11,862 <br />13 <br />EA <br />$ <br />512.90 <br />$6,415 <br />13 <br />EA <br />$ <br />569.08 <br />$7,117 <br />4 <br />EA <br />$ <br />256.45 <br />$1,069 <br />13 <br />EA <br />$ <br />342.03 <br />$4,278 <br />834 <br />LF <br />$ <br />54.21 <br />$45,199 <br />5,420 <br />LF <br />$ <br />45.50 <br />$246,590 <br />42 <br />EA <br />$ <br />256.45 <br />$10,691 <br />12,924 <br />LF <br />$30.95 <br />$399,984 <br />792 <br />EA <br />$ <br />201.14 <br />$159,321 <br />83 <br />EA <br />$ <br />286.18 <br />$23,861 <br />1,251 <br />LF <br />$52.43 <br />$65,572 <br />75 <br />EA <br />$ <br />259.38 <br />$19,464 <br />117 <br />EA <br />1 <br />342.03 <br />$39,925 <br />4 <br />EA <br />$ <br />629.53 <br />$2,624 <br />4 <br />EA <br />$ <br />2,645.00 <br />$11,027 <br />4 <br />EA <br />$ <br />384.68 <br />$1,604 <br />1 <br />LS <br />$ <br />7,500.00 <br />$7,500 <br />1 <br />LS <br />$ <br />13,000.00 <br />$13,000 <br />50 <br />50 <br />EA <br />$ <br />287.50 <br />$14,383 <br />38 Extend Condensate Pump Station $ <br />575.00 <br />$28,765 <br />21 EA $ <br />39 Single Pipe Support <br />1,581.25 <br />$32,960 <br />17 EA $ <br />40 Salvage and re -install single pipe support <br />52.03 <br />$868 <br />41 6" CSP Sleeve Road Crossing 83 EA $ <br />$3,470 <br />42 Install 10" x 6" PVC saddle or tee (for temporary manifold 1, 434 LF $ <br />) EA <br />12 00 <br />12.00 <br />22,012 <br />$$1 <br />$ <br />43 8" PVC flange & hardware <br />321.14 <br />339 <br />$1,339 <br />44 8' HDPE flange adapter, back-up ring, & hardware 4 EA $ <br />335.43 <br />$1,398 <br />4 EA $ <br />45 14" x 8" PVC Reducer <br />317.72 <br />$1,325 <br />4 EA $ <br />46 14" PVC Elbow <br />730.92 <br />$3,047 <br />47 18" PVC Couplings 4 $ <br />483.13 <br />$2,014 <br />625 EA $ <br />48 Paint PVC Wellheads/Piping <br />313.28 <br />$195,904 <br />1 LS $ <br />49 18" Electrofusion Coupling <br />53,000.00 <br />$53,000 <br />33 EA $ <br />50 4" PVC Couplings <br />930.92 <br />$31,047 <br />104 EA $ <br />51 6" PVC Couplings <br />29 27 <br />$3,051 <br />Subtotal 125 EA $ <br />49.74 <br />$6.221 <br />52 Miscellaneous glutlRrimer & shipping 1%$1,806,609 <br />1 LS $ <br />18 066.09 <br />$18066 <br />NOTES: TOTAL <br />$1 824 675 <br />Mobilization and demobilization included in Section 1 of Table 3. <br />Salvaged PVC header will have existing bells removed and replaced with couplings for re -installation. <br />Salvaged PVC fittings will be re -connected via installation of new couplings on both sides of fitting. <br />Salvaged PVC and HDPE pipe and fittings may require that some new replacement materials be purchased. <br />Unit costs utilized in this attachment were obtained from recent construction bids for ongoing work/expansion of <br />® <br />the LFG <br />system. The material quantity were based on the 187.6 acres Closure area in proportion to the closure of the Stage 1A partial <br />closure project completed in 2005 at the Forward <br />Landfill. <br />LFgSyslem Back-upBASC <br />