Laserfiche WebLink
• <br />• <br />TABLE 8 <br />FORWARD LANDFILL <br />CLOSURE COST ESTIMATE <br />SUMMARY <br />Item <br />No. <br />Description <br />Estimated <br />Quantity <br />Unit <br />Price <br />Total <br />($) <br />1 <br />FINAL COVER <br />Clear and Grub <br />347 <br />acres <br />$800.00 <br />$277,600 <br />Foundation Layer (1) <br />527,000 <br />c <br />$1.00 <br />$527,000 <br />Synthetic Membrane (VFPE) <br />Purchase, Delivery and Installation <br />15,845,000 <br />sf <br />$0.40 <br />$6,338,000 <br />HDPE Strip Drains (2) <br />1,584,500 <br />sf <br />$1.00 <br />$1,584,500 <br />Vegetative Soil Layer <br />1,054,000 <br />c <br />$1.00 <br />$1,054,000 <br />Settlement Monuments <br />4 <br />ea <br />$1,200.00 <br />$4,800 <br />Subtotal <br />$9,785,900 <br />2 <br />FINAL COVER CONSTRUCTION QUALITY ASSURANCE MONITORING AND TESTING <br />Monitoring/inspection <br />1 <br />LS <br />$420,000 <br />$420,000 <br />Geos nthetic Field Test Expenditures <br />1 <br />LS <br />$75,000 <br />$75,000 <br />Soil Field Test Expenditures <br />1 <br />LS <br />$50,000 <br />$50,000 <br />Reporting Cost <br />1 <br />LS <br />$50,000 <br />$50,000 <br />Subtotal <br />$595,000 <br />3 <br />DRAINAGE CONTROL SYSTEM <br />Drainage Control System Materials Construction <br />1 <br />LS <br />2,100,000 <br />2,100,000 <br />Design <br />1 <br />LS <br />$105,000 <br />$105,000 <br />Subtotal <br />$2,205,000 <br />4 <br />EROSION CONTROL <br />Soil Preparation <br />364 <br />acres <br />$105 <br />$38,307 <br />Seeding <br />364 <br />acres <br />$2,200 <br />$800,800 <br />Subtotal <br />$839,107 <br />5 <br />LANDFILL GAS CONTROL SYSTEM (3) <br />Design <br />- <br />LS <br />$250,000.00 <br />$250,000 <br />Vertical Wells <br />240 <br />wells <br />$7,500.00 <br />$1,800,000 <br />Headers <br />20,000 <br />LF <br />$35.00 <br />$700,000 <br />Sub -Headers <br />50,000 <br />LF <br />$15.00 <br />$750,000 <br />Horizontal Wells <br />35,000 <br />LF <br />$15.00 <br />$525,000 <br />Sums <br />50 <br />sums $8,000.00 <br />$400,000 <br />Flare Station <br />2 <br />ea <br />$300,000 <br />$600,000 <br />Subtotal <br />$5,025,000 <br />6 <br />1 LANDFILL GAS MONITORING SYSTEM (3) <br />0 <br />$0 <br />$0 <br />Subtotal <br />$0 <br />7 <br />IGROUNDWATER MONITORING SYSTEM (3) <br />0 <br />$0 <br />$0 <br />Subtotal <br />$0 <br />8 <br />SITE SECURITY SIGNAGE <br />Signage <br />1 <br />LS <br />$10,000 <br />$10,000 <br />Fencing <br />1 <br />LS <br />$20,000 <br />$20,000 <br />Subtotal <br />$30,000 <br />9 <br />ISTRUCTURE REMOVAL DECOMMISSIONING OF ENVIRONMENTAL CONTROL SYSTEM <br />Demolition <br />1 <br />LS <br />1 $50,000 <br />$50,000 <br />Subtotal <br />$50,000 <br />Forward Landfill PCPCMP <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:cpcostest.:5/21/02 Page 1 of 2 <br />BRYAN A. STIRRAT &. ASSOCIATES <br />