|
TABLE 9
<br />FORWARD LANDFILL
<br />• ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING
<br />COST ESTIMATE SUMMARY
<br />•
<br />•
<br />ItT'LFlare
<br />Description
<br />Quantity
<br />Unit Price
<br />($)
<br />Total
<br />($)>
<br />DFILL GAS CONTROL SYSTEM MONITORING AND MAINTENANCE
<br />Station Operation and Maintenance
<br />10,000 LS
<br />$10,000
<br />ce Grid Monitorin -
<br />45,000 LS
<br />$45,000
<br />ontal/Vertical Well
<br />Monitoring/Maintenance/Adjustiinent -
<br />38,000 LS
<br />$38,000
<br />Perimeter Probe Monitoring and Maintenance -
<br />780 LS
<br />$1,000
<br />Flare Source Testing -
<br />20,000 LS
<br />$20,000
<br />Truck, Instruments and Equipment -
<br />15,000 LS
<br />$15,000
<br />Management/Coordination/Expenses
<br />22,500 LS
<br />$22,500
<br />Reporting -
<br />7,000 LS
<br />$7,000
<br />Subtotal
<br />$158,500
<br />2
<br />GROUNDWATER MONITORING SYSTEM MAINTENANCE AND REPAIR
<br />Maintenance/Repair
<br />6,000 LS
<br />$6,000
<br />Subtotal
<br />$6,000
<br />3
<br />GROUNDWATER MONITORING
<br />Monitoring -
<br />36,000 LS
<br />$36,000
<br />Analysis
<br />50,000 LS
<br />$50,000
<br />Subtotal
<br />$86,000
<br />4
<br />LEACHATE MANAGEMENT SYSTEM
<br />Inspection and Maintenance -
<br />5,000 LS
<br />$5,000
<br />Leachate Sampling/Analysis -
<br />2,500 LS
<br />$2,500
<br />Leachate System Decommissioning (1) -
<br />2,000.1-
<br />$2,000
<br />Subtotal $9,500
<br />5
<br />STORMWATER MONITORING
<br />On-site Monitoring Costs -
<br />5,000 LS
<br />$5,000
<br />Analysis -
<br />2,000 LS
<br />$2,000
<br />Reporting -
<br />5,000 LS
<br />$5,000
<br />Subtotal $12,000
<br />6
<br />FINAL COVER INSPECTION MAINTENANCE AND REPAIR
<br />Inspection 96 hrs
<br />50 per/hr $4,800
<br />Cover Repair (2)
<br />50,000 LS
<br />$50,000
<br />Subtotal $54,800
<br />7
<br />LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE
<br />Inspection Maintenance
<br />Labor 20 hrs
<br />50 per/hr
<br />$1,000
<br />Materials ($900 to replace every 3 ears) -
<br />300 LS
<br />$300
<br />Aerial Survey (Once every 5 years)($14,000 5yrs) -
<br />2,800 LS
<br />$2,800
<br />Settlement Report
<br />Engineer 10 hrs
<br />105 per/hr $1,050
<br />Labor 6 hrs
<br />50per/hr $300
<br />Subtotal $5,450
<br />Forward Landfill PCPCMP
<br />L:\Allied\2000.193\Reports\FinaiPCPCMP:pccost:5/21/02 Page 1 of 2
<br />BRYAN A. STIRRAT & ASSOGIATEE
<br />
|