My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 1:11:09 AM
Creation date
7/3/2020 10:54:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_26
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_26.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 9 <br />FORWARD LANDFILL <br />• ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING <br />COST ESTIMATE SUMMARY <br />• <br />• <br />Item <br />No. <br />Description <br />Quantity <br />Unit Price <br />Total <br />8 <br />VEGETATIVE COVER INSPECTION <br />Vegetation <br />Inspection 48 hrs 50 per hr $2,400 <br />Soil Quality (first 3 years only) 347 acres 25 ac $8,675 <br />Rodent Control 96 hrs 50 Eer hr $4,800 <br />Weed Dust and Fire Control 180 hELJ 30 per/hr, $5,400 <br />Subtotal $21,275 <br />9 <br />ACCESS ROAD MAINTENANCE <br />Inspection <br />Labor 24 hrs 50 per hr $1,200 <br />Repair <br />Labor Materials (3) - 12,600 LS $12,600 <br />Subtotal $13,800 <br />10 <br />DRAINAGE CONTROL SYSTEM INSPECTION AND MAINTENANCE <br />Inspection 96 hrs. 50 per/hr $4,800 <br />Repair - 14,900 LS $14,900 <br />Sedimentation Basin Silt Maintenance - 6,700 LS $6,700 <br />Subtotal $26,400 <br />11 <br />SITE SECURITY INSPECTION AND MAINTENANCE <br />Labor <br />40 hrs 50 per hr $2,000 <br />Maintenance Repair <br />- 6,500 LS 1 $6,500 <br />Subtotal $8,500 <br />TOTAL ANNUAL POST -CLOSURE MAINTENANCE AND MONITORING COSTS $402,225 <br />TOTAL 30 YEAR POST -CLOSURE MAINTENANCE AND MONITORING COSTS $121,066,750 <br />Notes: <br />1. Leachate system to be decommissioned after the post -closure period. <br />2. 0.5 percent per year of the final cover construction costs. <br />3. Assumes regrading of all access roads every five years. <br />Forward Landfill PCPCMP <br />L:\Allied\2000.193\Reports\Fina[PCPCMP:pccost:5/21/02 Page 2 of 2 <br />BRYAN A. STIRRAT & ASSOCIATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.