Laserfiche WebLink
PRELIMINARY CLOSURE AND <br /> POST-CLOSURE MAINTENANCE PLAN <br /> FOR THE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 3.2 Final Cover 3-1 <br /> 3.2.1 Regulatory Design Standards 3-1 <br /> 3.2.2 Proposed Final Cover Design 3-2 <br /> 3.2.2 Final Cover Construction 3-4 <br /> 3.2.3 Sources of Cover Material 3-5 <br /> 3.2.4 Final Cover Construction Quality Assurance 3-5 <br /> 3.3 Final Grading 3-5 <br /> 3.4 Landfill Settlement 3-6 <br /> 3.4.1 Settlement Analysis 3-6 <br /> 3.4.2 Survey/Settlement Monumentation 3-7 <br /> 3.5 Landfill Slope Stability 3-7 <br /> 3.6 Drainage and Erosion Control 3-8 <br /> 3.6.1 Drainage Control System Design 3-8 <br /> 3.6.1.1 Hydrology 3-8 <br /> 3.6.1.2 Proposed Final Drainage Control System 3-9 <br /> 3.6.2 Soil Loss Analysis 3-9 <br /> 3.6.3 Erosion Control 3-10 <br /> 3.7 Leachate Treatment 3-11 <br /> 3.8 Landfill Gas Control 3-11 <br /> 3.9 Landfill Gas Monitoring System 3-13 <br /> 3.10 Groundwater/Surface Water Monitoring System 3-13 <br /> 3.11 Site Security 3-14 <br /> 3.12 Removal of Existing Structures 3-14 <br /> 3.13 Decommissioning of Environmental Control systems 3-15 <br /> 3.14 Closure Implementation Schedule 3-16 <br /> 4.0 POST-CLOSURE MAINTENANCE PLAN 4-1 <br /> 4.1 Introduction 4-1 <br /> ® 4.2 Final Cover Maintenance 4-1 <br /> 4.3 Drainage System Maintenance 4-1 <br /> Forward Landfill PCPCMP II <br /> L:\Allied\2000.193\Reports\Finalpcpcmp\FL-Toc.Doc:08/22/01 BRYAN A.STIRRAT S ASSOCIATES <br />