Laserfiche WebLink
PRELIMINARY CLOSURE AND <br /> POST-CLOSURE MAINTENANCE PLAN <br /> FOR THE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 4.4 Vegetative Cover Maintenance 4-2 <br /> 4.5 Leachate Control System Maintenance 4-2 <br /> 4.6 Landfill Gas Monitoring and Control System Maintenance 4-3 <br /> 4.7 Groundwater Monitoring and Control System Maintenance 4-3 <br /> 4.8 Access Road Maintenance 4-4 <br /> 4.9 Site Security Inspection and Maintenance 4-4 <br /> 4.10 Landfill,Settlement Monitoring and Maintenance 4-5 <br /> 4.10.1 Survey Record 4-5 <br /> 4.10.2 Survey/Settlement Monuments 4-5 <br /> 5.0 CLOSURE/POST-CLOSURE MAINTENANCE COST ESTIMATE 5-1 <br /> 5.1 Introduction 5-1 <br /> 5.2 Closure Cost Estimate 5-1 <br /> qP 5.2.1 Final Cover 5-1 <br /> 5.2.2 Final Cover Construction Quality Assurance Monitoring <br /> and Testing 5-1 <br /> 5.2.3 Drainage Control System 5-2 <br /> 5.2.4 Erosion Control 5-2 <br /> 5.2.5 Landfill Gas Control System 5-2 <br /> 5.2.6 Landfill Gas Monitoring System 5-2 <br /> 5.2.7 Groundwater Monitoring System 5-2 <br /> 5.2.8 Site Security/Signage 5-2 <br /> 5.2.9 Structure Removal/Decommissioning of Environmental <br /> Control Systems 5-3 <br /> 5.2.10 Engineering Design 5-3 <br /> 5.2.11 Construction Management 5-3 <br /> 5.2.12 Final Closure and Post-Closure Maintenance Plan (FCPCMP) <br /> Preparation 5-3 <br /> 5.2.13 Contingency 5-3 <br /> 5.3 Post-Closure Maintenance Cost Estimate 5-3 <br /> 5.4 Demonstration of Financial Responsibility 5-4 <br /> 6.0 PROFESSIONAL CERTIFICATION OF ACCURACY 6-1 <br /> Forward Landfill PCPCMP 111 <br /> L:\Allied\2000.193\Reports\Finalpcpcmp\FL-Toc.Doc:08/22/01 BRYAN A_STIRRAT&ASSOCIATES <br />