Laserfiche WebLink
in accordance with 27 CCR, Section 21190, must review any future proposed <br /> changes to the currently proposed end use that would require construction <br /> improvements. <br /> Facilities remaining at the Forward Landfill during the post-closure period will <br /> include the 1) access roads, 2) drainage control systems, 3) groundwater, gas, and <br /> leachate monitoring systems, 4) environmental control system facilities, and-5) <br /> stormwater and leachate surface,impoundments. <br /> Access roads are provided at the entrance and perimeter of the landfill, and on the <br /> landfill final cover to provide access for post-closufe,maintenance and monitoring <br /> activities. The location of the access roads is shown on Drawing 4 of the,TD. The <br /> access roads on the landfill final cover will be designed to preserve the integrity of <br /> the final cover. <br /> Forward Landfill PCPCMP 1-6 <br /> L:\Allied\2000.193\Reports\FinaiPCPCMP:FL-sec 1:08/20/01 <br /> BRYAN A.STIRRAT S.ASSOCIATES <br />