Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS -3- <br /> FORWARD INC.,FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> Unit, Area, Classification Description of Unit Status <br /> (area) acres <br /> A 8.0 Class I landfill Four trenches with compacted clay liner Postciosure maintenance and <br /> and dendritic LCRS.Built 1973. Contains monitoring.RCRA closure <br /> designated and hazardous waste. completed in 1989. Stopped <br /> receiving wastes in 1984. <br /> B- 2.8 Class III landfill Unlined.Construction debris and inert Temporarily inactive since 1986 <br /> North waste.Built 1978. <br /> B 12.1 Class III landfill Unlined.Nonhazardous solid waste Temporarily inactive since 1986 <br /> C 3.9 Class III landfill Compacted clay liner on floor,dendritic Temporarily inactive <br /> LCRS.Built 1984 at south end of WMU <br /> A- <br /> D-87 2.5 Class III landfill 2-foot compacted clay liner on floor, Temporarily inactive <br /> dendritic LCRS.Built 1987. <br /> I <br /> D-88 N 4.6 Class III landfill 4-foot compacted clay liner on floor, Operating <br /> dendritic LCRS. <br /> D-88 S 1.5 Class III landfill 4-foot compacted clay liner on floor, Operating <br /> dendritic LCRS.For non-acid leachate <br /> eneratin waste- <br /> D-89 3.5 Class III landfill 4-foot compacted clay liner,blanket Operating <br /> LCRS. <br /> D-93 4.6 Class II landfill Composite liner with 2-feet of compacted Operating <br /> clav,60-mil HDPE liner,blanket LCRS. ' <br /> D-94 2.5 Class II landfill Composite liner with GCI.as engineered Operating <br /> alternative in lieu of 2-feet of clay,60-mil <br /> HDPE,blanket LCRS(geocomposite <br /> drainaee net) <br /> Composite liner with 2-feet of compacted Operating <br /> D-95 9.0 Class II landfill <br /> clay,60-mil HDPE liner,blanket LCRS. <br /> Engineered alternative on the north side <br /> slope. <br /> Future 38.5 Class II landfill Composite liner with GCL as approved Permitted.To be constructed as <br /> D units engineered alternative or 2-feet of needed. <br /> compacted clay.HDPE liner,blanket <br /> LCRS. <br /> E 4.9 Class II landfill 2-foot compacted clay liner,blanket Operating First phase known as <br /> T C <br />