Laserfiche WebLink
-ITOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 42 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI August 16, 2008 Saturday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Hot and breezy I Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slope-board,excavator,623 scra er, 16 G Motograder,825 compactor,smooth drum roller,backhoe,2 forklifts <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn watered the completed low permeability soil surface with one water truck. <br /> - CQA monitored moisturizing of low permeability soil surface. <br /> - Geosynthetics deployment included 72,743 square feet of double textured geomembrane on the <br /> western one-third of the floor. <br /> Vector marked six destructive samples (DS-S21 throughDS-S27)on the double textured HDPE <br /> membrane. <br /> - Comanco conducted repairs,vacuum testing, and non-destructive air testing(fusion welds) on the <br /> western slope of the floor. <br /> - Destructive samples DS-S 17 through DS-S20 passed on site testing. <br /> - Comanco and Vector personnel inspected and approved the subgrade of the western one-third of the <br /> floor. <br /> - Received 26 rolls of double textured and 1 roll of single textured HDPE geomembrane. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />