Laserfiche WebLink
FC"TOR <br /> INEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 44 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI August 19, 2008 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> L Lnj Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scra er, 16 G Motograder,825 com actor,smooth drum roller,backhoe,2 forklifts <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Geosynthetics deployment encompassed 98,888 square feet of textured geomembrane on the <br /> northeastern portion of the floor. <br /> - Vector marked 3 destructive samples(DS-S49 through DS-S51) on the double textured HDPE <br /> membrane. <br /> Comanco conducted repairs, vacuum testing, and non-destructive air testing (fusion welds) on the <br /> south and eastern portions of the floor. <br /> - Destructive samples DS-D42 through DS-1351 passed on site testing. <br /> - Comanco and Vector personnel inspected and approved the subgrade of the final northeastern floor <br /> area. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />