Laserfiche WebLink
WMU FU-08 October 2008 <br /> Forward Landfill Project No.021605.08 <br /> 2.3 Project Personnel <br /> The following personnel participated in the construction of WMU FU-08. <br /> PROJECT ROLE ORGANIZATION NAME <br /> Owner Forward Inc. Lochlin Caffey <br /> Ruben Ramirez <br /> Earthworks Contractor Guinn Construction Larry Simms <br /> Geosynthetics Contractor Comanco <br /> Surveying RJA& Associates Buck Buxton, PLS <br /> Design Engineer Lewis Engineering Sangeeta Lewis, PE <br /> CQA Project Manager/ Vector Engineering, Inc. Monte Christie, PE, GE <br /> Certifying Engineer <br /> Assistant CQA Project Manager Vector Engineering, Inc. Bryan Fritzler, PE <br /> Lead CQA Monitor Vector Engineering, Inc. Evan Lindenbach <br /> Aaron Lickingteller <br /> Vector Engineering, Inc. • 143E Spring Hill Drive •Grass Valley,CA 95945•(530)272-2448 <br /> -4- <br />