My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-08 October 2008 <br /> Forward Landfill Project No. 021605.08 <br /> 5:1 SIDESLOPES <br /> • 1-foot thick protective operations layer (to be placed during <br /> operations); <br /> • Geocomposite drainage material; <br /> • 60-mil thick single-sided textured HDPE geomembrane; <br /> • Geosynthetic clay liner (GCL); and <br /> • Approximately 5-feet of engineered fill over existing Austin <br /> Road Landfill. <br /> 2.2 Project Construction Summary <br /> Earthwork construction of the 5:1 slope area of WMU FU-08 commenced in mid <br /> June 2008 and was essentially completed by July 1, 2008. Construction of the low <br /> permeability soil liner (LPSL) began mid July and was essentially completed by <br /> August 1, 2008. Geosynthetics installation started on August 11, 2008, with <br /> deployment of GCL, 60-mil single-side textured HDPE liner, then geocomposite, <br /> and was completed on August 24, 2008. <br /> Earthwork in WMU FU-08 was started the second week of June 2008 and was <br /> surveyed at finished grade on July 31, 2008. Installation of geosynthetics was <br /> started on August 11, 2008, with deployment of GCL, 60-mil single and double- <br /> sided textured HDPE and 12 oz. cushion geotextile, and was completed on August <br /> 24, 2008. Placement of LCRS gravel, installation of the LCRS pipes and coarse <br /> gravel, deployment of 7 oz. filter geotextile and placement of the operations layer <br /> soils began on September 2, 2008 and was completed for leak testing on September <br /> 18, 2008. <br /> Vector Engineering, Inc.• 143E Spring Hill Drive•Grass Valley, CA 95945-(530)272-2448 <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.