Laserfiche WebLink
rCTOR <br /> INEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 60 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI September 9, 2008 I Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers,2 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scraper, 16 G Motograder,825 compactor,smooth drum roller,backhoe,735 rock truck, 1 forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn completed covering the cell floor between the middle and northern leachate ditches with pea <br /> gravel followed by filter geotextile and operations layer soil. Two 627 scrapers,two 637 scrapers, <br /> two D-6 dozers, and a forklift with a bucket were used in the process. <br /> - 31,200 square feet of filter geotextile was placed by Guinn on the cell floor between the southern and <br /> middle leachate collection ditches. <br /> - A total of 9,708 square feet of 12-oz. filter geotextile was installed in the collection ditch against the <br /> 2:1 slope,the northeast portion of the eastern collection ditch, and the northern collection trench. <br /> - Guinn placed 325 linear feet of 6-inch pipe in the middle leachate collection ditch. Installed along <br /> with this was 4,875 square feet of filter geotextile. <br /> - Comanco installed two layers of 8-oz. filter geotextile in the northeast corner of the floor, <br /> encompassing 23,419 square feet for both layers and 11,710 covering the floor. This was deployed <br /> in place of 12-oz. cushion geotextile(see Aug.30 for reference). Seaming of the floor cushion <br /> geotextile with the slope geocomposite was completed. <br /> - Guinn continued pea gravel placement northward of the middle leachate collection ditch on the cell <br /> floor. <br /> - Total filter geotextile placed, including that in the ditch,was 45,783 square feet. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />